
Chapter 4: Cabling the Modular Switch
Cabling the AC Power Supplies
Quick Start Guide: 750 Series Modular Switches
25
Figure 4-2: Chassis ground locations (CCS-758)
To power down the switch, r
emove all power cords from the power inlets.
4.3
Cabling the AC Power Supplies
The switches use PWR-3351-AC-RED (
) AC power supplies. Power cables are included with
the accessory kit (
). To power the switch, connect the cables to the C20 connectors on the
PSU inputs, and insert the other side of the cables into the main power providing circuit(s).
Note
The power supply, handle color, orientation, etc. may be different in your device from the one shown in
1
Grounding locations
4
Supervisor modules
2
ESD attach point
3
Line cards
Содержание 750 Series
Страница 5: ...Quick Start Guide 750 Series Modular Switches 15 February 2021v Appendix H Taiwan RoHS Information 61 ...
Страница 6: ...vi 15 February 2021Quick Start Guide 750 Series Modular Switches ...
Страница 14: ...8 Quick Start Guide 750 Series Modular Switches Electrostatic Discharge ESD Precautions Chapter 2 Preparation ...
Страница 66: ...60 Quick Start Guide 750 Series Modular Switches Appendix G Regulatory Model Numbers ...
Страница 68: ...62 Quick Start Guide 750 Series Modular Switches Appendix H Taiwan RoHS Information ...