![Arista 750 Series Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/arista/750-series/750-series_quick-start-manual_2970769029.webp)
Quick Start Guide: 750 Series Modular Switches
23
Chapter 4
Cabling the Modular Switch
4.1
Cabling the Power Supplies
Before you begin, refer to the Arista Networks document Compliance and Safety Guide available at:
https://www.arista.com/en/support/product-documentation.
Important!
Power down the switch: Remove all power cords from the power inlets.
Mettez le commutateur: Retirez tous les cordons d'alimentation des prises d'alimentation.
Important!
Installation of this equipment must comply with local and national electrical codes. If necessary, consult
with the appropriate regulatory agencies and inspection authorities to ensure compliance.
Installation de cet équipement doit être conformes aux codes électriques locaux et nationaux. Si
nécessaire, consulter les organismes de réglementation appropriés et des autorités de contrôle pour
assurer la conformité.
Note
Many configurations will require additional power supplies.
Nombreuses configurations exigera des alimentations supplémentaires.
Important!
Read all installation instructions before connecting the system to the power source.
Lire toutes les instructions d'installation avant de brancher le système à la source d'alimentation.
shows the minimum number of operating power supplies that must be connected to active
circuits for each switch to operate.
Each power supply includes a fan that maintains proper power supply temperature. The appendices
display the location of components for all switches described in this guide.
4.2
Cabling Chassis Ground
and
display the location of the chassis grounding locations on the front panel of
the switches. Chassis ground locations are also located on the rear panel of the switch chassis
(
). After mounting the switch into the rack, connect at least one of the chassis grounds to
Содержание 750 Series
Страница 5: ...Quick Start Guide 750 Series Modular Switches 15 February 2021v Appendix H Taiwan RoHS Information 61 ...
Страница 6: ...vi 15 February 2021Quick Start Guide 750 Series Modular Switches ...
Страница 14: ...8 Quick Start Guide 750 Series Modular Switches Electrostatic Discharge ESD Precautions Chapter 2 Preparation ...
Страница 66: ...60 Quick Start Guide 750 Series Modular Switches Appendix G Regulatory Model Numbers ...
Страница 68: ...62 Quick Start Guide 750 Series Modular Switches Appendix H Taiwan RoHS Information ...