
6
Quick Start Guide: 750 Series Modular Switches
Tools and Parts Required for Installation
Chapter 2: Preparation
•
Airflow Orientation:
The fans direct air from the front panel to the rear panel. Orient the front panel
toward the cool aisle.
•
Rack Space Requirements:
shows the rack space requirements for each of the modular
switches.
Note
The accessory kit provides the required mounting hardware for each switch.
•
Power Requirements:
Arista switches require a minimum number of operating power supplies in
all chassis, and for each power domain of switches with multiple power domains. Refer to
for more details regarding your switch.
•
Other Requirements:
Select a site where liquids or objects cannot fall onto the equipment and
foreign objects are not drawn into the ventilation holes. Verify these guidelines are met:
•
Clearance areas to the front and rear panels allow for unrestricted cabling.
•
All front and rear panel indicators can be easily read.
•
AC power cords can reach from the AC power outlet to the input connectors.
2.2
Tools and Parts Required for Installation
The following tools are required to install a modular switch:
•
Mechanical device capable of lifting chassis being installed (
•
Torque reading nut driver (for DC power supplies)
•
#2 Phillips head screwdriver
Rack mount:
shows the rack components required for each of the modular switches.
1
The accessory kit includes screws that fit many common equipment racks.
2
Rack nuts are only for racks with unthreaded, rack-post holes.
2.3
Electrostatic Discharge (ESD) Precautions
Observe these guidelines to avoid ESD damage when installing or servicing the switch.
•
Assemble or disassemble equipment only in a static-free work area.
Table 2-2 Rack space requirements
Switch
Rack or cabinet (standard 19" EIA) Mount Kit
2-post
4-post
Switch Height (RU)
CCS-755
KIT-CCS-750-2P
KIT-CCS-750-4P
7
CCS-758
KIT-CCS-750-2P
KIT-CCS-750-4P
10
Table 2-3 Rack component requirements
Switch
Rack or cabinet (standard 19" EIA)
Rack screws
(1)
Rack nuts
(2)
Notes
CCS-755
14
14
2-post installation
4-post installation
CCS-758
18
18
2-post installation
4-post installation
Содержание 750 Series
Страница 5: ...Quick Start Guide 750 Series Modular Switches 15 February 2021v Appendix H Taiwan RoHS Information 61 ...
Страница 6: ...vi 15 February 2021Quick Start Guide 750 Series Modular Switches ...
Страница 14: ...8 Quick Start Guide 750 Series Modular Switches Electrostatic Discharge ESD Precautions Chapter 2 Preparation ...
Страница 66: ...60 Quick Start Guide 750 Series Modular Switches Appendix G Regulatory Model Numbers ...
Страница 68: ...62 Quick Start Guide 750 Series Modular Switches Appendix H Taiwan RoHS Information ...