Aries HIGH PURITY WATER SYSTEM Скачать руководство пользователя страница 10

ARIES FilterWorks, a division of ResinTech, Inc. * 160 Cooper Road * West Berlin, NJ  08091

Phone:  (856) 768-9600 * Fax:  (856) 768-9601 * www.arieswater.com

7.0   MAINTENANCE

This unit was designed and manufactured to have the ability to produce the purest water that can be obtained

for laboratory usage.   It purifies water that meets or exceeds the specifications recommended by CAP, ASTM,

for Type I Reagent Grade Water when it is operated and maintained according to these instructions.

  The ultraviolet lamp (if installed) must be changed once each year.

  The resin cartridges must be replaced when the purity meter indicates the water purity is below your

requirements 

or every 6 months

.

  The exterior surfaces may be wiped clean with a mild detergent and a soft cloth to keep the unit

clean  and  new  looking.

7.1 Changing  the UV Lamp

  It is not necessary to turn off the water supply to replace the lamp.

  The UV lamp may be turned off by switching the POWER switch to the off position. 

  Remove the top cover by removing the phillips head screws that attach it.   Gently lift the top cover up

and left, and set it aside.

  Unclasp the clamps that hold the stainless steel body of the UV light.   Gently lift the body up about 2

inches to allow clearance for bulb removal.

  Pull gently on the bulb socket to disengage the wire from the bulb.   Slide the old bulb out of the UV

body  and  discard.

  Grasp the new UV lamp by the plastic end and slide it inside the body making sure the 4 contact

prongs stick out of the unit.   Re-attach the bulb socket and wire making sure that the contacts seat

firmly into the socket.

  Gently push UV body back into the bracket.   Squeeze clamps until the click firmly about the UV body

  Replace the top cover and turn the unit on.

WARNING!!  ELECTRICAL SHOCK HAZARD

Before removing the top cover, disconnect the power cord. 

FAILURE

 to do so could result in electrical

shock or personal injury.

Hold the UV lamp by the plastic ends 

ONLY.   DO NOT

 touch the glass. Finger prints and oils from your

hands will etch the glass and reduce UV life & performance.

If the lamp should become oily or dirty, clean it with a clean soft tissue or cloth wetted with isopropyl

alcohol.

Содержание HIGH PURITY WATER SYSTEM

Страница 1: ...ARIES HIGH PURITY WATER SYSTEM Operation Maintenance Manual Version 1 1a...

Страница 2: ...u have any questions concerning the operation of the unit or need service refer to section 11 0 REQUESTING SERVICE When requesting service you will need the model and serial number as well as the purc...

Страница 3: ...Principles of Purifying Water 4 0 Product Specifications 5 0 Before Using Your Dispenser 5 1 Setup 5 2 Installing the Cartridges 5 3 Startup Procedure 5 4 Initial Polishing of new cartridges 6 0 Displ...

Страница 4: ...er cord grip the plug and pull it from the wall outlet NEVER PULL ON CORD DO NOT use this appliance outdoors This appliance is intended for commercial industrial institutional and professional use Use...

Страница 5: ...ure successful water system operation Trace organic chemicals can interfere with highly sensitive reactions and alter biological processes TDS Total Dissolved Solids conduct electricity This conductiv...

Страница 6: ...t a glance The quick connect cartridge system makes replacing filters a simple task For optimum performance the Aries High Purity Water System may require reverse osmosis distillation or deionizing pr...

Страница 7: ...sformer UV Combination for Bacteria and TOC Wall Mounting Kit Reverse Osmosis Pre treatment Packages Re circulating Spray Gun 0 05 micron Pyrogen removal filter Typical Applications Media Prep Tissue...

Страница 8: ...tion valve at this time 5 2 Installing the Cartridges There are three 3 cartridge positions The water flows from left to right Any pretreatment filters must be installed in position 1 furthest from th...

Страница 9: ...g to confirm the effectiveness of the treatment process is the owners responsibility 6 0 DISPLAY AND KEYPAD FUNCTIONS Be sure you understand the function of each button before using them Function Keys...

Страница 10: ...e top cover by removing the phillips head screws that attach it Gently lift the top cover up and left and set it aside Unclasp the clamps that hold the stainless steel body of the UV light Gently lift...

Страница 11: ...rom the outlet Place a wad of paper towels around each plunger to absorb the small amount water that will come out of the filters plungers and or upper fitting Remove the three cartridges starting wit...

Страница 12: ...s 1 5 0 micron prefilter 1 GAC carbon filter and 1 1 0 micron post filter 9 5 Aries HPL RO Replacement Membrane AM 12 7010 Replacement membrane is a thin film composite PA membrane with 100 GPD output...

Страница 13: ...se barb connection 9 12 Blank Sanitization Cartridges VP 17 0000 Blank VP Style cartridges for sanitization of unit 3 required per Aries System Sanitization kit sold separately 10 0 REQUESTING SERVICE...

Страница 14: ...turned on Bad Solenoid Have unit serviced by an authorized dealer or return to factory A filter cartridge is loaded with particles and plugged No flow Replace the filter cartridge Capsule filter is bo...

Страница 15: ...llege of American Pathologists ASTM American Society for Testing and Materials NCCLS National Committee for Clinical Laboratory Standards EU Endotoxin Units N L No Limit The measurements of pH in Type...

Страница 16: ...anty ARIES ResinTech Inc assumes no other responsibility or liability This warranty does not cover any product which has been subject to misuse neglect accident or used in violation of operating instr...

Отзывы: