15 IP tests
158
ARGUS 165
Display during FTP upload:
Display of test status:
You can observe the running test or start a
new test here, see page 230.
-
Current upload/total number of uploads,
in this example the first upload out of
three (1/3) is displayed.
-
Data already transferred (current /
overall) (in this example 13 % / 4 %).
-
Current net upload rate
(in this example 15,030 Mbit/s).
-
Current net average upload rate
(in this example 14,9355 Mbit/s).
-
Bytes transferred so far
(in this example 22,062 MB).
-
Overall file size
(in this example 90,367 MB).
-
Current and overall transferred data
-
Current upload time in h:min:s.
-
Remaining transfer time.
<Test
status>
Displays test status without
ending the test or starting a
new test, see page 230.
Cancels test.
<New>
Selects a new single test.
<Stop>
Stops FTP upload test.
Press shift:
<Stop all>
Stops all active tests.
<Finish all>
Finishs all test.
FTP upload
Содержание 165
Страница 26: ...4 Quick start guide 26 ARGUS 165 ...
Страница 37: ...5 Configuring accesses ARGUS 165 37 Test parameter settings are described starting on page 124 ...
Страница 170: ...15 IP tests 170 ARGUS 165 ...
Страница 235: ...19 Parallel tests ARGUS 165 235 ...
Страница 284: ...23 Copper tests 284 ARGUS 165 ...