of each module and their centre of gravity should be considered during the lifting process. Lift the unit slightly in
order to check its position.
The unit should be placed on top of a plane, levelled surface that supports its weight. The location where the unit
will be placed should have enough space to allow the doors of its several sections to open correctly and allow
access to installation and maintenance procedures in the unit.
It is advisable to use anti-vibration mounts at the base of the unit.
JOINING THE SECTIONS
Units are often provided in several sections and the person responsible for the installation should join these
sections at the installation spot.
This operation should be conducted using the materials provided. These can be found inside the unit.
Apply the adhesive gasket (tape) to the aluminium profile of the sections you wish to join.
Press the parts at the joining of the sections that are in the interior corners of the sections.
Press the parts that are along the interior of the sections (if there any) that need to be joined.
Note:
in some cases, it may be necessary to remove some panels from the units, in order to access the joining
parts in the sections. To do this, take the lids off and unscrew the screws in order to easily remove the panel.
Because of their size, some energy recovering sections may be sent partially disassembled. In such cases, special
care should be taken to avoid damaging these delicate components.
Check if the gaskets and sealing silicones do not allow air to bypass these elements. In the case of heat
exchangers with integrated bypass damper, make sure that the register works correctly.