ARES™ HIGH-SECURITY STEEL FENCING
3
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
General Guidelines
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits. The fencing installer should determine and
implement appropriate installation techniques for
each installation situation. Fortress Building Products and
its distributors shall not be held liable for improper or
unsafe installations.
Before You Begin
Contact your local Building Code Department for required
permits and laws regarding your fence project.
Call 811 before you dig post holes to locate and identify
any buried utilities.
These are typical instructions. Communications from the
Engineer or Architect of record supersedes these typical
instructions.
Note:
• When cutting Fortress Fencing, it is very important to
complete the following at cut points:
• Remove all metal shavings from the cut area.
• File any sharp edges left by cutting. Thoroughly wipe and
remove any filings, grime, or dirt.
• Apply two coats of Fortress zinc based touch-up paint to
the cut area. If touch up is at rail ends, allow paint to dry
before connecting bracket to I-Beam Post.
• Be sure to remove any metal shavings from the surface of
Fence.
Содержание Citadel Panel
Страница 1: ...ARES HIGH SECURITY STEEL FENCING 1 ARES HIGH SECURITY STEEL FENCING INSTALLATION INSTRUCTIONS ...
Страница 11: ...ARES HIGH SECURITY STEEL FENCING 11 Fig 10 Fig 9 Fig 8 Fig 11 Fig 14 Fig 13 Fig 12 ...
Страница 13: ...ARES HIGH SECURITY STEEL FENCING 13 Fig 20 Fig 19 Fig 18 Fig 21 Bolt holes on rail bracket aligned ...
Страница 25: ...ARES HIGH SECURITY STEEL FENCING 25 ...