52
SELETRON CONNECTION
13.2
SELETRON REPLACEMENT
13.2.1 Preliminary Operations
TO AVOID ACCIDENTS, EMPTY THE TANK AND MAKE SURE THAT THE ENTIRE SYSTEM IS COMPLETELY FREE
FROM CHEMICALS.
IMPORTANT
Operate main valve and section controls (ON position) and carry out the indicated settings:
General control ON
++
Open sections
++
Active nozzles
++
MANUAL nozzle selection
++
MANUAL section management
“HOME” SCREEN
“HOME” SCREEN
Enabled nozzles
Par.
MANUAL nozzle selection
Fig. 113
Par.
“HOME” SCREEN
“HOME” SCREEN
MANUAL section management
Fig. 114
13.2.2 Replacement procedure
Fig. 115
Correctly paired Seletron
NOT correctly paired Seletron
-
ONLY DISCONNECT THE SELETRON DEVICES THAT WERE NOT CORRECTLY PAIRED
(
Fig. 115).
CONTINUES > > >