![Aquatica Digital 20086 Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/aquatica-digital/20086-series/20086-series_manual_2961822010.webp)
10 |
Housing preparation
Housing preparation
Follow these steps to prepare your AZ7 housing:
STEP 1:
Assemble the grips onto your housing using the provided screws and
Allen key.
STEP 2:
Suggested configuration
Strobes arms on the handle ball mounts (1)
4
Focus lights or external monitors on Top ball mount (2)
4
Scooter, underwater camera slider, tripod mount on (10)
4
STEP 3:
Mount your strobes on the arms and connect them to the housing. For
details about optical flash triggering and wired bulkheads, refer to the
Flash triggering section page 24
Follow your strobe manufacturer
manual and its recommendations.
STEP 4:
Before use, remove the main O-ring seal from its groove on the front
half of the housing and carefully verify that the O-ring and its groove
are free from scratches or foreign matter. Lubricate the O-ring with a
light coat of silicone grease.
4
Refer to Housing components section