Membrane cleaning.   Working pressure 0 bar!!!

 

 

Description:

  

 

When  the  fresh  water  production  decreases  more  than  15  %,  the  membrane  should  be 
cleaned chemically. 

 

Caution

:  

 

Cleaning chemical no. 1 is alkaline and cleaning chemical no. 2 is an acid. Please consider 
the hazard notes on the canisters. Working with chemicals, please wear protective glasses, 
breathing  protection  and  rubber  gloves  for  your  own  safety.  Do  must  not  mix  different 
chemicals.  

 

Follow instructions below to avoid that chemical get into your fresh water tank.  

 
 

Cleaning of membranes. Working pressure 0 bar!!!

 

 

Instruction for cleaning 

 
Attention:

  

Make  sure  that  you  follow  the  following  instructions  carefully  so  that  no  cleaning  chemical 
gets into your fresh water tank. 

 

1) Close the seawater intake valve.  

 

2) Open the 

pressure control

 valve entirely, turn the product water three-way valve (no. 2) 

to position 

test-outlet

 to avoid that chemicals get into the drinking water tank. 

 

3) Rinse the system with fresh water as described in “Fresh water flushing”.  

 

4) Turn the 3 three-way valve (no. 4) according to the flow diagram “Long term preservation 

(mothballing) of the plant”. Open valve (no. 1).  

 

5) Blend  about  5  liters  warm  chlorine-free  fresh  water,  temperature  appr.  25°  Celsius  (77° 

Fahrenheit), with chemical no. 1 (Alkaline), according to the instructions on the package. 
Since there are about 1,5 liters of water already in each membrane and 1 liter of water in 
each  filter,  please  add  the  according  amount  of  chemical  to  the  water  that  has  to  be 
blended in every membrane and filter.  

 

6) Switch on the feed pump and the high-pressure pump. The unit is run for an 5 minutes to 

circulate the solution through the membrane. Temperature of the solution must not exceed 
more then 45° Celsius. Then allowed to rest for an hour, and then run again for 5 minutes. 
Perform possibly exiting the test outlet liquid back into the preservative tank. 

 

7) The chemical in the tank can be discharged overboard after turning the three-way  valve 

(no. 4). It should be noted that the system gets no air.  

 

8)  After this, the system is put back into service, unpressurized, and run for 15 minutes or so 

to clear out the cleaning solution, before being returned to regular service. Once again, the 
initial product water will need to be discharged for 30 minutes over the test outlet. 

 

9) If there is no change in freshwater output, repeat the procedure 1 to 7 with chemical no. 2 

(Acid). 

 

Attention: 

Prior  to  a  longer  period  of  shutdown,  the  Aquatec  has  to  be  preserved  with  Biocide  after 
cleaning and flushing. 
 

Caution

:  

At  every  recommissioning  after  cleaning  or  mothballing,  divert  the  product  water  over  the 
test-outlet for the first 30 minutes to rinse the chemical completely out of the system.

 

Содержание DD 500

Страница 1: ...User Manual Version 09 2019 17 Aquatec Watermaker DD 500 Modular 12 or 24 Volt DC...

Страница 2: ...st be reduced Like any piece of mechanical equipment the system will require inspection and service from time to time For easy access to enable a simple regular monitoring and proper maintenance do no...

Страница 3: ...fresh water flush 9 10 Long term preservation mothballing antifreeze 11 Membrane cleaning 12 Flow diagram 13 18 Installation 19 Electrical connection 20 Maintance 21 Change of membranes 22 23 Trouble...

Страница 4: ...2 pcs stainless steel V4A high pressure fittings for self installation 6 m PVC reinforced hose for intake and discharge line All needed plastic fittings and stainless steel hose clamps 6 m PE tube 3 8...

Страница 5: ...motic pressure is around 30 bar The described process however is reversible by exposing the liquid on the seawater side to mechanical pressure At a pressure of 30 bar the osmotic process cannot take p...

Страница 6: ...hree way valve No 2 to position test outlet 4 Switch on the feed pump De aerate the plant if necessary The gauge feed water option must show positive pressure De aerate the pre filter system and contr...

Страница 7: ...Flowdiagram fresh water production 5 Pressure regulation valve 6 Flowmeter product water 7 ships fresh water pump 8 Feed pump 10 Seacock not scope of delivery Fresh water flushing Working pressure 0 b...

Страница 8: ...amount of flushing water by discharging the rinsing water into a bucket once after a normal operation take off the hose at the thru hull fitting and check the salinity constantly by tasting During the...

Страница 9: ...rely turn the product water three way valve no 2 to position test outlet to avoid that chemicals get into the drinking water tank 3 Rinse the system with fresh water as described in Fresh water flushi...

Страница 10: ...there is a risk of frost if possible it is also preferable to blow pressurized air through it in the direction of flow for this purpose remove both hoses Alternatively switch on HP pump short for app...

Страница 11: ...l no 1 Alkaline according to the instructions on the package Since there are about 1 5 liters of water already in each membrane and 1 liter of water in each filter please add the according amount of c...

Страница 12: ...ow diagram DD 500 Hose dimensions inner diameter see specification page 24 5 Pressure regulation valve 6 Flowmeter product water 7 ships fresh water pump 8 Feed pump 9 Gauge feed pressure option 10 Se...

Страница 13: ...he feed pump To avoid mechanical stress do not mount the strainer directly to the sea cock The feed pump must be flooded before turn on otherwise the bearings will be destroyed by drought The system h...

Страница 14: ...with the supplied Y or T fittings From the three way valve no 2 direct one pipe to the test outlet and one pipe from the outlet to the fresh water tank If necessary use the supplied adapters from the...

Страница 15: ...y of accidental contact is made Attention After mounting exchange the upper red plastic srew in the crankcase for the dipstick with ventilation Membrane housing pressure vessel For the installation of...

Страница 16: ...se and shoulder of the screw nut to enable the hose expanding in length 3 Attention It is very important to lubricate the insert thread nipple before screwing into the ferrule to avoid seizing of the...

Страница 17: ...over winding the fittings Connection product water pipe After the connection of the self sealing high pressure hoses exchange the 1 4 screw plug that seals the one sided product water connection in th...

Страница 18: ...ny plane surface with the help of the enclosed webbing and the plastic long eyelets The required bore 21 mm for the enclosed tank connection must be provided by the installer already made for some typ...

Страница 19: ...y high pressure pump 7 High current relay 8 High pressure pump connection red positive pump turns clockwise 9 Feed pump Supply line for the switches feed pump and relay control 1 5 to 2 5 mm Connectin...

Страница 20: ...ce a year Earlier when the oil gets a white color by condensation water Service pressure regulation valve Maintenance is limited to cleaning and silicone grease lubrication after 12 24 months The O ri...

Страница 21: ...g the membranes screw off the M6x20 screws each at both ends at the AQUATEC pressure vessel Screw tightening torque for the holding clips 3 Nm Then take off the stainless steel holding clamps Thereaft...

Страница 22: ...lush via the on board pressurized water system is often optimal for removing existing air from the system Note Grease the thread of the valve screws with metal free anti seize paste for stainless to p...

Страница 23: ...ion according to specification too low Cause Probably dirty or defective valve Current consumption consistent with specification OK Recommendation accurate test of the HP pump output Instruction for t...

Страница 24: ...t no 35 heat up to about 250 Secure nut no 35 with loctite 270 To tighten nut no 35 a torque wrench must be used 20Nm Pump head Note Grease the thread of the valve screws with metal free anti seize pa...

Страница 25: ...older ss 18 mm Typ AC75 135 AC KC 150 190 240 3 15 141495 O Ring 56 82x2 62 NBR70 1 41 141501 O Ring 28 3 x 1 78 NBR 70 Kit 110 3 16 141474 Bearing 2 17 141505 Shaft seal 18 x 26 x 6 3 141517 Kit 160...

Страница 26: ...pipe Hose product water to fresh water tank 1 2 13 mm High pressure hose Technical datas Pc membrane typ seawater SW 2540 1 Typ membrane Polyamide Thin Film Composite Working pressure 3 4 salinity 55...

Страница 27: ...27 Dimensions Motor pump unit DD 500 direct drive weight 19 90 kg...

Страница 28: ...s und indicates the pressure between sediment filter and high pressure pump If the pressure indicates toward 0 bar the pre filters have to be cleaned or exchanged Pressure control valve with pressure...

Страница 29: ...29 Memos...

Отзывы: