CAUTION
Unauthorized start-up while mounting
Risk of injury!
Make sure that unauthorized start-up is not possible while mounting.
Comply with the appicable working regulations during all work on the system.
NOTE
When existing systems are altered:
Take the flow meter out of operation in order to flush the system clean of debris.
Flushing information on page 11.
Trial operation
Start trial operation (without flow meter); open the stop valves
slowly
when doing this.
Carry out a pressure test in the plant.
Check for leaks and tightness of all bolts.
Flush the pipework until clean (flow meter out of pipeline).
Release the pressure and stop the system again.
This trial operation ensures that the pipework is tight and clean and that there are no foreign
bodies in the pipe that could damage the flowmeter.
Installing the meter in the pipe
Remove the protection plugs or caps
from the flow meter (inlet and outlet).
Insert the flow meter into the pipeline in the prescribed position and flow direction. The arrow on
the flow meter should correspond with the direction of flow. Install mating flanges parallel and
without tension in the pipe.
NOTICE
Mechanical connection of flow meter into the pipe systems.
Risk of leakage!
Always use appropriate sealing material as per connection type.
Meter with
flanged ends
Meter with
threaded ends
For pipes made of copper or thin-walled steel pipes, the flow meter requires additional fastening.
Use appropriate fasteners.
incorrect