Visage™ Digital Installation Guide  5

Declaration of Conformity

Aqualisa Products Limited declares that the 

Quartz Smart Valve™ and supplied controller, 

in conjunction with pairing remotes, complies 

with the essential requirements and other 

relevant provisions of the Low Voltage 

Directive (2014/35/EU), and the EMC Directive 

(2014/30/EU). 

After installation

Familiarise the end user with the operation 

VISAGE™ DIGITAL INSTALLATION

This product must be installed by a competent person in accordance with the relevant 
Water Supply Regulations.
Prior to installation, ensure all additional guides supplied with this product are read and 
understood.
In addition to the guide below, it is essential that the important information (above) 
is read and understood and that you have all the necessary components before 
commencing installation.
The Visage™ Digital shower system is supplied with universal fixings intended to secure it 
to a suitable wall.

Although the Quartz Smart Valve™ complies with all relevant EMC standards, if incorrectly 
sited, it may interfere with digital TV reception. Please follow the recommendations below to 
minimise this effect.
See recommended layouts below. 
Images of Quartz Smart Valve™ for illustration only, refer to instruction 1 for orientation.

• Route cables separately, and as far apart from each other as possible.
• Aerial to point away from the Quartz Smart Valve™.
• Ensure the distance between the Quartz Smart Valve™ and the aerial is as large as possible.

LAYOUT WHICH COULD CAUSE PROBLEMS

LOWEST PROBABILITY OF INTERFERENCE

Digital TV Interference

AERIAL

LARGEST POSSIBLE DISTANCE

DATA 

CABLE

POWER 

CABLE

CABLE 

TO  TV

HIGH PROBABILITY 

OF INTERFERENCE, 

BOTH RADIATED 

AND CONDUCTED

POWER 

CABLE

CABLE 

TO  TV

DATA 

CABLE

AERIAL

SHORT DISTANCE

Installation videos are available on our website www.aqualisa.co.uk/installation-videos  
or alternatively, scan the QR code on the reverse of this guide. 

IMPORTANT INFORMATION

of this product and hand them all literature. 

Complete and post the guarantee card or 

register online at www.aqualisa.co.uk

Guarantee

Aqualisa products are supplied complete with 

a 1 year parts and labour guarantee that can 

be upgraded by registering the product with 

Aqualisa. See www.aqualisa.co.uk/guarantee  

for details.

Содержание Visage

Страница 1: ...VISAGE DIGITAL INSTALLATION GUIDE...

Страница 2: ...de 2 CONCEALED COMPONENTS 1 2 EXPOSED COMPONENTS 1 1 Gravity stored water systems only 2 Mains fed and separately pumped water systems only 2 1 Gravity stored water systems only 2 Mains fed and separa...

Страница 3: ...ituations where the ambient temperature is likely to fall below 5 C or rise above 40 C We do not recommend the use of a controller in steam therapy facilities This appliance must be earthed Cables mus...

Страница 4: ...ED PUMP Shower Heads The range of shower heads has been designed for use with Smart systems Installation of any shower heads other than these may result in poor shower performance If at any stage duri...

Страница 5: ...sited it may interfere with digital TV reception Please follow the recommendations below to minimise this effect See recommended layouts below Images of Quartz Smart Valve for illustration only refer...

Страница 6: ...operation and installation of this product the Quartz diverter MUST be installed in one of the orientations shown PLEASE NOTE If installing a diverter please also note all areas ma For installation wi...

Страница 7: ...e to the mounting surface using the screws provided if suitable 4 Attach the supply pipes to the Quartz Smart Valve ensuring that the cold and hot feeds are fitted into the appropriately marked inlets...

Страница 8: ...ign the screws used must be non corrosive Power supply to the Quartz Smart Valve must be switched off before connecting or removing the controller Unscrew the two front cover fixings at the base of th...

Страница 9: ...le plug into the back of the controller ensuring both rubber skirts are recessed into the connection see diagram below using a blunt flat bladed screwdriver or similar tool if required To make a water...

Страница 10: ...truction please ensure the entry hole is neat and unobtrusive otherwise the inner tube could be visible within the showering area Remove ceiling plate if required DO NOT use a compression fitting or s...

Страница 11: ...acket over the rail and support pillar and mark the fixing points Remove the fixing bracket and drill and prepare the fixing points using the fixings provided if suitable Secure the bracket to the wal...

Страница 12: ...kirts are recessed into the connection see diagram below using a blunt flat bladed screwdriver or similar tool if required To make a water tight fitting ensure the rubber seal is no longer visible 12...

Страница 13: ...hat these are located in an accessible dry location and not in the bathroom 1 THIS APPLIANCE MUST BE EARTHED We recommend protecting surface mounted cables in suitable approved conduit to avoid the ri...

Страница 14: ...default Standard Quartz Smart Valve Combi Factory default will be Normal HP this setting must be changed to Combi for temperature stability and optimum performance Balanced High Pressure Standard Quar...

Страница 15: ...allation Guide 15 Wiring Diagram Single Outlet BLENDED WATER COLD HOT 3AMP FUSED ELECTRICAL CONNECTION 10m CABLE 10m CABLE CONTROLLER WIRED REMOTE supplied separately Cables must be run in conduit or...

Страница 16: ...lve Using a flat bladed screwdriver adjust the MAX TEMP ADJUSTMENT control as indicated When the temperature has been set to the desired position carefully replace the Quartz Smart Valve lid and secur...

Страница 17: ...spacer fitting 2 Trim the projecting pipe to a length of 15 22mm measured from the face of the gripper ring using a suitable cutter If a hacksaw is used the pipe end must be carefully de burred and c...

Страница 18: ...he single release button of the handset holder and slide onto the rail assembly 11 Carefully slide the gel hook onto the rail under the handset holder 12 Secure the top rail bracket into position on t...

Страница 19: ...must be passed through the gel hook which has been designed to be utilised as a hose restraint Disengage the pivot clip and remove the pivot from the bottom of the handset Ensure the hose washer is in...

Страница 20: ...e Supply Hot water cylinder Connect A or B Cold feed to cylinder B A NB THE BASE OF THE AQUALISA SMARTVALVETM MUST BE SITED NO HIGHER THAN THE BASE LEVEL OF THE CISTERN Central heating boiler Supply U...

Страница 21: ...max Controller 10m max 10m max Controller Underside of cistern Supply Pressure reducing valve if required Central heating boiler Supply Supply Underside of cistern Hot water cylinder Cold feed to cyli...

Страница 22: ...e temperature dial to the required setting 1 Press the Start Stop button on the controller to turn the shower on 2 The temperature may be adjusted whilst in the shower 4 The LED display will flash unt...

Страница 23: ...reduce the need for chemical descaling in hard water areas your shower head incorporates a clear flow system whereby any scale build up can be broken down by gently rubbing the flexible tips of the j...

Страница 24: ...the dial towards the hottest setting Isolate hot and cold feeds to the Quartz Smart Valve disconnect from the inlet spigots and then using the isolation valve bleed through the hot and cold supplies R...

Страница 25: ...on Logic Module of Quartz Smart Valve If hot water supply is from a combination boiler the Logic module mode MUST be set to COMBI Airlock in water supplies for gravity fed systems only See Air lock in...

Страница 26: ...es enquiries 01 864 3363 Service enquiries 01 844 3212 Aqualisa International Jan Palfijnstraat 26 002 Kortrijk Belgium 8500 Part No 705521 Issue 01 Mar 21 Please note that calls may be recorded for t...

Отзывы: