![Aqualisa Visage Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/aqualisa/visage/visage_installation-manual_2960112010.webp)
Visage™ Digital Installation Guide 10
CONTROLLERS - EXPOSED SHOWER
Positioning the controller
Think about the location of the controller.
Choose a suitable height so all users can easily see and use the controller. If the ceiling
height is over 2.4m (8ft), a 550mm riser rail extension kit will be required. Contact our
Customer Service Department to purchase a riser rail extension kit (part no: 910920).
The centre of the riser rail stands 45mm from the wall.
20
1
Locate a suitable entry point into the ceiling for the riser rail, avoiding joists and services.
2
Drill a hole through the ceiling, a minimum of Ø30mm, maximum Ø40mm.
The ceiling plate cannot be sited against an uneven surface. If there is coving or an
alternative obstruction, please ensure the entry hole is neat and unobtrusive; otherwise
the inner tube could be visible within the showering area. Remove ceiling plate if required.
DO NOT use a compression fitting or soldered joint to connect the outlet pipe to the top
of the exposed product. The black push fit elbow provided MUST be used.
This connection MUST be sited in a position that is safely accessible for commissioning,
servicing and maintenance purposes.
Failure to meet these requirements will invalidate the warranty.
3
Feed the data cable through the hole
in the ceiling followed by the riser rail
assembly containing the supply pipe.
Ensure the controller is at the desired
height, the rail is vertical, and that there
is adequate working clearance above
the top of the rail in the roof space.
4
Drill and prepare the fixing points using the fixings supplied,
and fix the unit to the wall using the screws provided, (if suitable).
Содержание Visage
Страница 1: ...VISAGE DIGITAL INSTALLATION GUIDE...