background image

Rise Digital Bath

installation instuctions

page 4

Important information

Safety information

This product must be installed by a competent person in accordance with all relevant current Water Supply Regulations.

ALL PRODUCTS REQUIRING AN ELECTRICAL CONNECTI0N MUST BE INSTALLED BY A QUALIFIED PERSON FOLLOWING THE LATEST
REVISION OF BS 7671 (WIRING REGULATIONS) AND CERTIFIED TO CURRENT BUILDING REGULATIONS.

This system should be installed so that other taps or appliances operated elsewhere within the premises do not significantly affect the
flow.

The Digital bath must not be used with a hot water supply temperature of over 65ºC.

The processor is supplied factory pre-set at maximum temperature of 45ºC. The maximum temperature is fully adjustable to suit site
conditions. If adjusted, we recommend the outlet temperature is set to a MAXIMUM of 46ºC.

THE DIGITAL PROCESSOR MUST BE INSTALLED IN AN ACCESSIBLE LOCATION FOR SERVICING AND MAINTENANCE.

The Digital processor must not be installed in situations where either the ambient temperature is likely to exceed 40ºC or where freezing
may occur.

The control must not be installed in situations where the ambient temperature is likely to fall below 5ºC or rise above 70ºC.

We do not recommend the use of Rise Digital in steam therapy facilities.

This appliance must be earthed.

Cables which are chased into the wall must be protected by a suitably sized conduit or sheathing to allow for removal in the event of
service and maintenance purposes. Ensure that the conduit is run to avoid the controller fixing holes.

Surface mounted cables must also be protected by a suitable approved conduit, even in a loft, where there may be

a risk of damage from

vermin.

The power lead must only be replaced by the manufacturer or his accredited agent.

The user control is supplied from a safety low voltage source.

This product is suitable for domestic use only.

Rise Digital is supplied complete with a 5 year guarantee.

This product is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities or lack of
experience and knowledge, unless they have been given initial supervision or instruction concerning the use of the product by a person
responsible for their safety.

Children should be supervised to ensure they do not play with the product.

Installation of Digital pumped processor (for gravity stored systems)

The Rise Digital pumped bath system is designed to operate up to maximum static pressure of 100kPa
((1 bar)(10 metres head)(14.5psi)).

Under no circumstances must the pumped processor be connected directly to the water main or in line with another booster pump.

The minimum actual capacity of the cold water storage cistern should be not less than 225 litres (50 gallons). The capacity of the hot
water cylinder must be capable of meeting anticipated demand.

Installation of Digital standard processor (for balanced high pressure and unvented
systems, combination boiler systems and separately pumped gravity systems)

Pressures: The Rise Digital standard bath system is designed to operate up to a maximum static pressure of 700kPa ((7 bar)(100psi)).
Where pressures are likely to exceed 700kPa ((7 bar)(100psi)), a pressure reducing valve must be fitted to the incoming mains supply.
A setting of 400kPa ((4 bar)(60psi)) is recommended. It should be noted that daytime pressures approaching 600kPa ((6 bar)(80psi))
can rise above the stated maximum overnight.

Special notes for combination boiler systems

The appliance must have a minimum domestic hot water rating of 24kW (80,000BTU) and be of the type fitted with a fully modulating
gas valve.

If in any doubt, please contact the appliance manufacturer before installation commences.

PLEASE NOTE: DUE TO PERFORMANCE CHARACTERISTICS OF COMBINATION BOILERS, BATH FLOW RATE MAY VARY WITH CHANGES TO
THE MAIN INLET TEMPERATURE. INLET TEMPERATURE CHANGE MAY ALSO CAUSE THE DIGITAL CONTROLLER TO FLASH. THIS IS NOT
NECESSARILY CHANGING THE OUTLET TEMPERATURE.

Special notes for separately pumped gravity systems

We recommend a twin ended pump with a MINIMUM pump rating of 1.5 bar. For optimum performance a twin ended 2.5 bar pump
should be used.

The minimum actual capacity of the cold water storage cistern should be not less than 225 litres (50 gallons). The capacity of the hot
water cylinder must be capable of meeting the anticipated demand.

THIS PRODUCT IS NOT SUITABLE FOR USE WITH A SINGLE ENDED PUMP.

Connections

This product incorporates ‘push-fit’ type connections. Tube should be cut using a rotary type cutter and lubricated using a silicone-
based lubricant or petroleum jelly (Vaseline or similar) prior to insertion into the fitting.

If plastic pipe is used, the tube insert must not increase the tube diameter or extend the cut-off length by more than 2mm.

THESE FITTINGS ARE NOT SUITABLE FOR STAINLESS STEEL TUBE.

Содержание RSDB1X

Страница 1: ...er Responsibility Regulation 2004 This product is outside the scope of the European Waste Electrical and Electronic Equipment Directive as interpreted within the UK In the UK this product can therefore be disposed of through commercial non WEEE waste facilities The original manufacturer does not accept any liability under the WEEE directive ...

Страница 2: ...gital Bath installation instuctions page 2 Bath system Rise Digital Bath with overflow filler Rise Digital Bath with overflow filler HP Combi RSDB1X Rise Digital Bath with overflow filler Gravity Pumped RSDB2X ...

Страница 3: ...Rise Digital Bath installation instuctions page 3 Components HP Combi Components Gravity Pumped ...

Страница 4: ...h the product Installation of Digital pumped processor for gravity stored systems The Rise Digital pumped bath system is designed to operate up to maximum static pressure of 100kPa 1 bar 10 metres head 14 5psi Under no circumstances must the pumped processor be connected directly to the water main or in line with another booster pump The minimum actual capacity of the cold water storage cistern sh...

Страница 5: ... working parts of this unit All soldering must be completed and the pipe work thoroughly flushed out in accordance with current Water Supply Regulations prior to connection of the product After installation Familiarise the end user with the Rise Digital operation and hand them this guide Complete and post the guarantee card or register online at www aqualisa co uk ...

Страница 6: ...tion and installation of this product the processor MUST be installed in one of the orientations shown 1 Isolation valves are supplied with the Digital processor and must be fitted on both inlets and the blended water outlet All pipe work should be run in 15mm pipe All pipe work should be supported For externally pumped gravity fed installations 22mm pipe work should be run as close to the process...

Страница 7: ...D IN THE LOFT SPACE THE ROUTE TO AND THE AREA AROUND THE PROCESSOR MUST BE BOARDED TO ENSURE SAFE WORKING ENVIRONMENT Place the Digital processor on a solid mounting surface and place the fixing feet into suitable positions Mark then drill and prepare suitable fixings before securing the processor to the mounting surface using the screws provided 4 Flush out the hot and cold supply pipes 5 The max...

Страница 8: ...mastic groove on the back of the mounting plate and press into position onto the finished wall surface Ensure the data cable is held securely by the narrow middle slot of the mounting plate and fix to the wall using the screws provided 10 Plug the data cable into the rear of the controller and push fully home Slide the controller assembly onto the mounting plate Secure the controller to the back p...

Страница 9: ...damage from vermin The data cable and power lead should also be clipped in place with P clips or similar to avoid accidents BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED THE ELECTRICITY SUPPLY MUST BE TURNED OFF AT THE MAINS SWITCH ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED PERSON Connect the low voltage data cable into the socket adjacent to the temperature adjuster as indicat...

Страница 10: ...should not be selected for bath systems fitted to combination boilers PUMPED PROCESSORS Pumped processors fitted to gravity systems may be set to NORMAL GRAVITY or for water economy ECO flow rate modes N B We recommend the processor is set to NORMAL GRAVITY mode WHEN MAKING ANY ADJUSTMENT TO THE PROCESSOR SETTINGS THE POWER MUST BE ISOLATED Run the bath at maximum temperature factory pre set to 45...

Страница 11: ...water level has reached the desired height press the start stop button to turn off the bath fill 2 The amended run time has been recorded 3 The Rise Digital bath product has a factory set maximum run time of 12 minutes If required this can be adjusted anywhere from 1 second up to 30 minutes to suit the site conditions by adopting the following procedure Due to the performance characteristics of co...

Страница 12: ... installation guide for full fitting instructions Aqualisa Products Limited reserves the right to revoke the guarantee if an overhead shower kit system is fitted with a bath controller The bath overflow filler is suitable for baths up to a maximum thickness of 24mm Carefully unscrew and remove the overflow filler outlet from the body assembly and set aside 1 Carefully unscrew and remove the bath w...

Страница 13: ... to the body assembly 7 Remove the relevant inlet blanking plug and attach the flexible hose to the blended inlet connection 8 Connect the flexible hose to the blended supply pipe ensuring suitable non restrictive double check valves are fitted in line with current Water Supply Regulations not supplied 9 Waste pipe extension kit If required for larger baths a 900mm waste pipe conversion kit is ava...

Страница 14: ...ctions page 14 Remove the clamping nut and sealing washer from the waste pipe and set aside 2 Carefully pull the waste pipe away from the outlet assembly 3 Reassemble the unit using the longer waste pipe by reversing the above procedure 4 ...

Страница 15: ...utton Bath Top up Rise Digital Bath features a Top up button wich provides a method of topping up your bath at the desired temperature at a minimum flow rate To operate the bath in Top up mode 1 Turn the temperature dial to the required setting 2 Press the Top Up button to begin topping up the bath The bath will run for 1 minute before stopping automatically N B The bath fill can be stopped at any...

Страница 16: ...llation compatible with pumped processor T Typical HP system installation compatible with standard processor Typical thermal storage unit system installation compatible with standard processor T Typical installations Supply Pressure reducing valve if required 10m max Digital shower control Supply Vent and draw off pipe to hot water Underside of cistern Hot water cylinder NB 1 5 bar MINIMUM pump ra...

Страница 17: ...of Ireland 01 844 3212 Brochure Hotline 0800 652 3669 Website www aqualisa co uk Email enquiries aqualisa co uk Please note that calls may be recorded for training and quality purposes The company reserves the right to alter change or modify the product specifications without prior warning Registered Trademark Aqualisa Products Limited Part No 700067 Issue 01 Jan 12 ...

Отзывы: