Adjustable height head installation
Adjustable height head installation
1
Prepare pipework from the shower valve to the required position for the hose outlet using a Ø15mm copper
pipe. Slide the wall spacer down the projecting pipe flush with the finished wall surface.
2
Slide the 15mm gripper ring down the projecting pipe flush with the wall spacer
fitting.
3
Trim the projecting pipe to a length of 15-22mm using a rotary type cutter. If a hacksaw is used, the pipe
end must be carefully de-burred and chamfered.
4
Clean and lubricate the pipe using a suitable (silicone based) lubricant.
15
5
Remove the locking screw, rotate the chrome outlet assembly and remove the outlet
from the wall mounting plate.
6
Place the wall outlet mounting plate onto the pipe assembly and mark and prepare
the fixing points, using the fixings provided, if suitable.
7
Ensuring the locking screw hole is positioned at the bottom; secure the wall mounting plate to the wall
using the screws provided, if suitable.