background image

1-877-256-3467 

www.AquaFX.net

 

 

 

DOLPHIN INSTALLATION INSTRUCTIONS 

 

Congratulations on your new AquaFX  DOLPHIN water treatment system.   There are a few basic steps about the installation and 

maintenance of your water treatment system.  If you should have any difficulties or questions, please do not hesitate to contact us and we will 

be happy to help you any way we can. 

 

It is recommended you hook your RO unit to a softened water supply. 

 

Your system was custom built to order, and it is ready to hook up to a water supply with the appropriate adapters included. Aqua FX pressure 
tests all systems prior to shipping, so your RO membrane will not be installed, you simply remove the membrane 

                         

 

 
 
 
from the plastic bag and place it in the white housing 

 

 

    it is located across the top  

of the unit.   Insert the end with the double O-rings in first.    
 
Before you  can hook the unit up to a supply.   

 

1)

 

Unpack your unit completely. 

2)

 

Inspect for any damage or broken parts as a result of shipping. 

3)

 

Locate and connect the supply side of the equipment.  This will be the right side as you face the system.  The supply side will consist of 

Black

 ¼” tubing and has the connection for the type of water supply you specified. 

4)

 

Locate the 

drain line, and place in an appropriate area for drainage. 

5)

 

Locate the 

blue

 product water line that will provide treated water for use and slip the tubing into the left side of the system. 

6)

 

Once installed, allow the system to run for approximately 15 minutes to flush membrane completely.  Please check systems for leaks, 
parts can come lose during shipping! 

7)

 

You will know when to replace the reusable color changing DI when the resin color has completely changed (the cartridge will change 
colors from the bottom up).  The sediment and carbon block filters (stage 1 and 2) should be changed According to accompanying chart 
or sooner if,  you notice your pressure gauge drop 5 PSI or more you should then replace the stage 1 and 2 filters.  You need at least 35 
PSI supply pressure to permeate the membrane.  

 

8)

 

The only way to check your membrane for proper rejection is with a TDS Meter (Total dissolved solids)

 

9)

 

You are now ready to make clean, fresh, ultrapure water.

 

 

These instructions cover the most common set up configurations.  If you ordered different colored tubing or 

filter cartridge housings, you may not be able to follow these instructions completely.  All AquaFX systems 

come with a 

3 year limited warranty

.  All Clear Canisters MUST be re-placed after 3 years.  Please contact 

us if you have problems with your unit.  Customer is responsible for filter and membrane changes and 

associated costs.  AquaFX carries a complete line of parts and accessories for all of our systems at 

www.aquariumwaterfilters.com

.  Thank you for your business! 

 

The three major variables that control permeate are temperature, pressure and incoming water 

quality.  We can control these to some extent; please do not hesitate to call us for assistance  

 
 
 
 
 
 
 
 
 

 
 
 
 
 

Double O-Rings

Содержание 3 Stage Dolphin RO

Страница 1: ...olphin RO Instruction Owner s Manual 7208 Aloma Ave Suite 100 Winter Park FL 32792 Phone 407 599 2123 Fax 407 599 2124 www Aquariumwaterfilters com www AquaFX net 7208 Aloma Ave Suite 100 Winter Park...

Страница 2: ...ft side of the system 6 Once installed allow the system to run for approximately 15 minutes to flush membrane completely Please check systems for leaks parts can come lose during shipping 7 You will k...

Страница 3: ...The Effect of Temperature on Permeate Production using a 50 GDP TFC Membrane...

Страница 4: ...water temperature 50 GPD is produced at approximately 72 degrees F at a constant pressure of 50 PSIG and constant TDS of 125PPM Sodium softened water Temp F GPD Factor 77 50 1 68 42 85 875 59 36 5 730...

Страница 5: ...s which require custom materials or components i e custom tanks brackets electrical components cannot be cancelled once special material has been ordered and or production has begun Accessories Drinki...

Страница 6: ...supplies ONLY Warranty begins at the time of product registration and must be registered within 10 days of the date of purchase This warranty does not require replacement of the entire unit The defect...

Страница 7: ...pm Chlorine Cl2 The Chloramine Blasters are run 2 in series and will yield approximately 8000 gallons of treated water Do not exclude drain water from this capacity as it is treated water 3 Reverse Os...

Страница 8: ...he water will exit out of the drain Make sure a Flow restrictor is present Very little slow water production Reference units flow rate vs actual production Slow flow from RO is normal Cold water low p...

Страница 9: ...se DI to remove the ammonia RO DI DOLPHIN Mako and Great White users will have the ammonia removed by the DI This will tax the DI Chloramines appears in several forms so the decreased life would depen...

Отзывы: