6
P
LACEMENT
(
CONT
.)
>
>
>
60'
>
>
60'
>
30'
>
>
30'
Large structures, Natural ventilation
In large structures with natural ventilation, propel fog
the length of the structure with the first fan row no more
than 30' from the end wall. The first fan should be:
- centered along the end wall (or)
- placed no more than 30' from the side wall,
with additional fans in the row equally spaced no
farther than 60' apart.
Lengthwise, the fans should be equally spaced and no
more than 60' apart. All fans should be equipped with
oscillation, sweeping 360˚.
Large structures,
Closed or minimum ventilation
In closed structures with little to no ventilation, propel
fog the length of the structure with the first fan row no
more than 50' from the end wall. The first fan should
either be:
- centered along the end wall (or)
- placed no more than 50' from the side wall,
with additional fans in the row equally spaced
no farther than 100' apart.
Lengthwise, the fans should be equally spaced and no
farther than 100' apart. All fans should be equipped
with oscillation, sweeping 360˚.
>
>
>
100'
>
>
100'
>
50'
>
>
50'
If you are planning to operate two fans using a
single control (purchased from the manufacturer),
we recommend ordering extended water and
power lines. Units should be equal distances from
the controls to reach a centrally-located control.
Operating two fans with one control
>
Control location area
Optional: extended water and power lines