18
POWERING UP:
Prior to turning on the UV unit, the following must be verified:
1. The UV chamber should be filled with water. The flow of water for the
initial filling should not exceed 50 GPM. Failure to comply may result in
quartz sleeves breakage.
•
Ensure there are no system leaks and no piping connection leaks.
•
All earth ground connections are properly made.
•
All lamp connections are properly made.
•
The socket cover is secured to the end of the UV treatment unit.
•
Verify that all incoming power conductors, including the ground
conductor, are properly terminated.
2.
Turn on the electrical power to the UV unit.
3. Observe the UV LED Operational Display. For non-Aqualogic 2000
®
units, the LED should illuminate yellow when the lamp is on. For the
Aqualogic 2000
®
units, the Lamp Status LED should change from RED to
GREEN. GREEN indicates the lamp is “ON”, RED indicates the lamp is
“OFF”.
4.
Connect the Monitoring Detector Cable, if equipped.
CAUTION!
PRIOR TO ENERGIZING THE BALLASTS AND LAMPS, ENSURE THERE IS NO WATER LEAKING
INTO THE QUARTZ SLEEVES AND COMPRESSION NUT CAVITIES BY PROPERLY INSTALLING THESE
COMPONENTS. EVEN A SMALL LEAK CAN FLOOD A QUARTZ SLEEVE AND COMPRESSION NUT CAVITY.
DURING OPERATION, HIGH VOLTAGE IS PRESENT AT THE LAMP PINS AND RECEPTACLES OF THE LAMP
CONNECTORS. PROLONGED FLOODING OF THE QUARTZ SLEEVE AND COMPRESSION NUT CAVITY CAN
CAUSE PREMATURE FAILURE OF THE LAMP CONNECTOR CABLE AND MAY RESULT IN A MELTDOWN OF THE
CABLE INSULATION.
SAFETY
ISSUE
1.800.423.3015
(outside California and within domestic USA)
email:
web:
www.aquafineuv.com
Содержание optima hx series
Страница 44: ...44 ...