background image

12

E.  Position the Drinking Water Holding Tank and 

Make the Final Hose Connections. 

1.  Check the tank precharge pressure. Make sure 

it is between 5 to 7 psig. If not, use a bicycle 

hand pump or other pump to bring the pressure 

up to the 5 to 7 psig range.

2.  Pull the cap/plug off the top of the tank where 

the Tank Shut–Off should go. (Refer to Fig. 1, 

page 5.)

3.  Wrap Teflon tape three times around the ¼" 

male outlet thread. Wrap in the direction of the 

threads (clockwise when looking down on the 

Holding Tank). The tape will act as a thread 

sealant. Screw on the Holding Tank Shut–Off 

Valve.

4.  Locate the 3/8" Yellow Tubing connected to the 

elbow on top of the manifold and run the tubing 

along its course to the tank and trim to length. 

Insert tubing into the Holding Tank Shut–Off 

Valve. Make sure the tubing is pressed all the 

way in to create a pressure tight connection. 

F.  Start Up

  At time of start up and each time the filters are 

changed the system should be sanitized (also 

 

see Operation and Maintenance  Sec. V, B.1–4).
1.  Sanitizing the system. Use a drip pan to aid 

clean–up. 

 

NOTE:

 The system should be sanitized 

BEFORE installing the Sediment/Carbon 

Prefilter, the Activated Carbon Post Filter or the 

R.O. Membrane.
•Use a good quality unscented 5¼% liquid 

chlorine household bleach. 

•Open the Dispensing Faucet and open the 

Holding Tank Shut–Off Valve (the handle 

should be parallel with the valve body). 

•Remove the plug on the underside of the 

manifold labeled “SEDIMENT/CARBON”. 

Pour one capful of bleach (this is 

approximately 2 tsp. or 10 ml) into one of the 

white Housings. Insert Housing O–ring into 

the Housing groove, (press firmly in place). 

Engage and firmly tighten the Housing hand 

tight only.

•Remove the plugs labeled “MEMBRANE” and 

“ACTIVATED CARBON” from the underside of 

the manifold. To each of the remaining white 

Housings, add one capful of bleach. Insert a 

Housing O–ring, engage and firmly tighten the 

Housings hand tight only.

•Slowly open the Feed Water Saddle Valve 

(turning counter clockwise). 

•As soon as the water begins to come out of 

the Dispensing Faucet, close the Faucet.

•Let stand for 15 minutes. 

 

NOTE:

 During this time, check the system 

carefully for leaks. 

•At the end of 15 minutes, CLOSE the Feed 

Water Saddle Valve and open the Dispensing 

Faucet. 

•Allow the Holding Tank to completely drain, 

then remove the Sediment/Carbon Prefilter 

Housing (the farthest of the three from the 

 

In–Out ports), empty, and install the 

Sediment/Carbon Prefilter. Firmly tighten the 

Housing hand tight only. 

•Remove the Activated Carbon Post Filter 

Housing (the closest of the three to the 

 

In–Out Ports), empty, and install the Activated 

Carbon Post Filter. Firmly tighten the Housing 

hand tight only. 

2.  Installing the R.O. Membrane:

•Remove the R.O. Membrane Housing, (the 

middle one), and empty. 

•Insert the Membrane up into the manifold. (The 

O–rings should be up toward the manifold.) 

Check the Housing O–ring for proper position 

in its groove, engage and firmly tighten the 

Housing hand tight only.

3.  Rinsing the system: 

•Slowly open the Feed Water Saddle Valve fully 

counter clockwise. 

•The Holding Tank Valve should be open.
•Check the Air Gap Window on the Dispensing 

Faucet to be sure that the drain water is 

flowing. The RO System is now making water.

•Do not open the Faucet for at least 8 hours.
•Do not use the first three full tanks of water.

 

CAUTION:

 The RO Membrane is shipped 

with a preservative in it. To ensure proper 

rinsing of the R.O. Membrane it is important 

to wait at least 8 hours before emptying each 

tank.

  When the Faucet is first opened, expect air 

and carbon fines (very fine black powder) 

from the Activated Carbon Post Filter to be 

rinsed out. This is normal for the first tank of 

water or after the Activated Carbon Post Filter 

is changed.

SECTION V.  OPERATION & MAINTENANCE

A.  Normal Operation 

1.  It is normal for the Total Dissolved Solids (TDS) 

of the water to be higher than normal during 

the first 5 gallons of operation; this is due to the 

sanitizing solution and the new Post Filter. 

Содержание AQPC-35

Страница 1: ...t NSF ANSI Standard 58 for the reduction of the claims specified on the Performance Data Sheet 7785 East U S Highway 36 Avon Indiana 46123 317 272 3000 Installation Operation and Maintenance Manual AQ...

Страница 2: ...eceiving treatment for cancer recipients of organ or bone marrow transplants transplant patients taking immunosuppressive drugs and persons who have congenital immunodeficiencies The EPA has stated th...

Страница 3: ...and is less susceptible to fouling by particulate matter turbidity and colloidal materials ACTIVATED CARBON POST FILTER The product water from the Holding Tank passes through the Activated Carbon Post...

Страница 4: ...is available to the user as reverse osmosis treated water when the system is operated without a storage tank or when the storage tank is bypassed Efficiency rating means the percentage of the influen...

Страница 5: ...clude wood screws or machine screws and nuts for mounting the manifold or concrete anchors for hanging on basement wall additional tubing or tube connectors plastic wire ties for organizing tubing Fig...

Страница 6: ...ctivated carbon post filter housing Reverse osmosis membrane housing sediment carbon prefilter housing BASEMENT FLOOR please note if air gap in faucet is not used in basement installations a proper ai...

Страница 7: ...open area beneath the faucet under the sink for attaching product and drain tubing are considerations A 2 diameter flat surface is required above and below the installation site The thickness of the m...

Страница 8: ...ller drill as a pilot and then drill a diameter hole to accept the bolt of a 1 Greenlee Hole Punch 1 chassis punch Clean away any chips Install the punch and tighten the nut to cut the hole Deburr any...

Страница 9: ...OLYTUBE TO DRAIN PORT ON RO SYSTEM BLUE 3 8 POLYTUBE PRODUCT OUTLET 5 Connect the tubing to the Faucet Push the Blue 3 8 Polytube into the 3 8 Quick Connect Fitting Push the Black 3 8 Polytube onto th...

Страница 10: ...you feel the Valve Handle firmly seated in the clockwise direction the copper tube is pierced and the valve is closed 2b To install on hard steel or brass tubing supply line The supply line should no...

Страница 11: ...cket can be used as a template Install the screws and tighten them until the heads are about 5 8 from the wall RED BLACK YELLOW IN DRAIN OUT DRAIN RESTRICTOR B L U E 2 Locate the Red Feed Water Tubing...

Страница 12: ...mly tighten the Housings hand tight only Slowly open the Feed Water Saddle Valve turning counter clockwise As soon as the water begins to come out of the Dispensing Faucet close the Faucet Let stand f...

Страница 13: ...arbon Prefilter and the Activated Carbon Post Filter Housings Discard the filters 3 Wash the inside of the Housings using a mild detergent and a soft cloth Do not use abrasive cleaners or pads Thoroug...

Страница 14: ...tioning Replace ASO Valve components Low pressure at the Dispensing Faucet Activated Carbon Post Filter is plugged Replace Post Filter Air precharge in the Holding Tank is too low Empty water from Hol...

Страница 15: ...lding Tank Clean flush and sanitize the system Replace the filters The Product Water and Drain Water lines are reversed Correct plumbing Dissolved gasses in the Feed Water Pretreat Feed Water to remov...

Страница 16: ...16 MADE IN USA 1 2 3 4 5 6 7 8 9 11 12 13 14 18 19 20 Exploded View Parts List 21 Water Quality Test Kit 22 Nitrate Nitrite Test Kit 15 17 10 15...

Страница 17: ...RO Membrane 50 gpd 189 lpd 13 S3069 Housing O Ring 14 S3010 Housing 15 PK A6TEU4 MG 1 4 Post X 3 8 Polytube Elbow 17 S2116 5 Drain Restrictor 50 GPD 189 lpd Green 18 S7125 Activated Carbon Post Filter...

Страница 18: ...18 NOTES...

Страница 19: ...19 NOTES...

Страница 20: ...s not cover the disposable sediment and carbon filters whose service life depends on feed water conditions In addition the membrane is only warranted if the required feed water conditions are met The...

Отзывы: