![Aqua Leader CREATION Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/aqua-leader/creation/creation_manual_2958471010.webp)
3.10: Verification
At this stage, it is very important to take measures after the installation of the wall as the parameters are likely to
have changed.
3.11: Attach a rope to the steel rod in the middle of the pool.
3.12: Pull the rope to the wall keeping the rope under tension, measuring the curve from one side of the pool
to the other side. If the bottom joining plate and the bottom wall channel are not in the circle, take time to
adjust.
10