ANCHOR INSTALLATION: SAW-CUT RETRO-FIT 

Required Materials & Tools: 

 

Concrete saw with Diamond blade 

 

Tape Measure 

 

4’ long Straight edge or chalk line 

 

Sledge Hammer 

 

Cold Chisel 

 

Torpedo Level 

 

Sting line 

 

Concrete & Concrete tools 

 

#4 Rebar 

 

1)

 

Locate  the  anchor  plate,  four  (4)  anchor  inserts  with 
nuts  and  mounting  hardware). 

(Part  number               

F-04CAJP23 / F-04CAJP26 - See picture above).   

2)

 

Mark  out  a  section  of  the  pool  deck  that  you  are 
removing  using  a  chalk  line  or  straight  edge  and  a 
marker.  You should plan on removing at least a Three 
foot by three foot section.   

3)

 

Using the saw with the diamond blade, make your cuts 
along the lines that you marked. 

4)

 

Using the sledge hammer, break up the concrete within 
the area that you cut and remove the pieces. 

5)

 

After you have removed the portion of the deck, verify 
that your new deck will be able to be at least 6 inches 
deep. 

6)

 

Remove  ONE  of  the  nuts  from  each  of  the  anchor 
inserts and place the anchor inserts through the larger 
holes in the anchor plate.  Thread the nut back on the 
other side of the anchor insert so that the anchor plate 
is sandwiched between the nuts. (See diagram on left). 

7)

 

Install rebar in the open area of the deck. Tie the rebar 
into the existing deck if possible. 

8)

 

Set  the  anchor  system  in  place  making  sure  that  the 
center line of the front anchor inserts are no more than 
23  (26)  inches  away  from  the  pools  edge  (depending 
on which anchor you are using). 

9)

 

Using the string line or a straight edge, make sure the 
top  of  each  anchor  body  is  level  and  flush  with  the 

FINISHED

  deck  surface.    Each  anchor  body  can  be 

adjusted  individually  by  turning  the  nuts  with  a  large 
wrench. 

10)

 

Bond the anchor system using the bonding lug on the 
anchor  plate.  The  anchor  should  be  bonded  to  the 
pool’s  bonding-grid  according  to  your  local  code 
requirements. (See NEC Article 680.26). 

11)

 

Pour your concrete and finish the pool deck surface. 

12)

 

Once the concrete has cured, install the lift by aligning 
the holes in the lifts base with the anchors installed in 
the deck.  Secure the lift to the deck using the stainless 
steel  hardware  that  comes  with  it.    (See  drawing 
below)  

a.

 

NOTE:  Use  Anti  Seize  on  the  hardware  to  prevent  the 

hardware from seizing in the anchor inserts. 

 

Содержание F-004PLB-23-AT1

Страница 1: ...PONENTS 5 DO NOT USE THE PRO POOL LIFT FOR WATER DRAFTS OVER 12 DECK TO WATERLINE 6 NEVER OPERATE THIS LIFT UNDER LOAD WITH NO WATER DRY POOL 7 WARNING FOR SAFETY REASONS NEVER SWIM ALONE 8 SAVE A COP...

Страница 2: ...8 ANCHOR INSTALLATION NEW CONSTRUCTION 9 PRO POOL AT LIFT ASSEMBLY INSTRUCTIONS 10 24V BATTERY OP INSTALL INSTRUCTIONS 11 BATTERY MAINTENANCE 12 2nd HANDSET KIT INSTALLATION OPTIONAL 13 PRO POOL AT LI...

Страница 3: ...T S S LIFT ANCHOR BOLTS 2 4 1 2 FLAT WASHER S S LIFT ANCHOR BOLTS 3 1 ANTI SEIZE CREAM PACKET 1 PRO POOL AT EXT BASE LIFT W FOOTREST 2 24V BATTERY 3 BATTERY CHARGER W MOUNTING PLATE POWER CORD 4 ANCHO...

Страница 4: ...ed CLEAR DECK SPACE as shown The setback distance can be as much as 26 with the 26 extended base and will still be ADA compliant NOTE ADA requires a deck slope of no greater than 1 48 as shown NOTE Th...

Страница 5: ...d to drill to b NOTE Depending on your local grounding requirements you may need to drill one hole larger than the others so that you can ground at least one of the anchor inserts In some cases saw cu...

Страница 6: ...emove the anchor assembly and fill each hole in the pool deck at least half full of two part construction epoxy not included Aqua Creek recommends either Hilti Brand HIT RE 500 SD or Simpson brand SET...

Страница 7: ...back on the other side of the anchor insert so that the anchor plate is sandwiched between the nuts See diagram on left 7 Install rebar in the open area of the deck Tie the rebar into the existing de...

Страница 8: ...the deck may be thinner 4 is typical as long as it is 6 thick around the lift The new deck should be reinforced with five 5 sticks of 5 rebar each way centered in slab Our minimum requirement is that...

Страница 9: ...the way into the socket Failure to fully push the remote cord into the socket may result in faulty or interrupted operation 4 Before installing the battery place it on the charging unit and let it cha...

Страница 10: ...cator tone will sound The low battery tone indicates that there is approximately 20 battery life remaining At this point DO NOT ATTEMPT TO OPERATE THE LIFT remove the battery from the unit and recharg...

Страница 11: ...the battery terminals 6 Keep battery terminals clean and free from dirt and corrosion to ensure good contact The terminals may be cleaned using Scotch Brite or any similar product Clean off any corro...

Страница 12: ...nd 2 button handset remote a bracket for holding the remote at the proper fixed location and a y adapter cable for connecting the two handsets to the control box To install the device remove the back...

Страница 13: ...tion before attempting to exit the chair on the deck To lower the lift into the pool simply apply pressure on the down arrow button on the remote control handset and the chair will start to move towar...

Страница 14: ...of the HEADREST ASSEMBLY are shown below along with the chair to show how it attaches The wing nuts allow for quick adjustment without having to remove the assembly from the chair The headrest pad is...

Страница 15: ...emoved from the assembly to install or remove the HEADREST PAD When installing the pad thread the bracket through the top loops first and then press the flaps together hooks loops fastener to complete...

Страница 16: ...the SUPPORT BRACKET into the slots on the top of the chair The INTEGRATED HEADREST ASSEMBLY is now ready to adjust and use NOTE The INTEGRATED HEADREST ASSEMBLY will work on all 2nd generation 18 wide...

Страница 17: ...Also be sure to check all of the contact points terminals for damage or corrosion If you notice corrosion gently clean the terminals To clean corrosion from the terminals use a q tip and some rubbing...

Страница 18: ...lift for extended periods will significantly shorten the battery s lifespan If the lift is being STORED for an extended period of time follow all of the steps above Check for rusting at all crevice a...

Страница 19: ...ange charge light to illuminate on the front of the charger When the orange light goes off the battery is fully charged B When the battery is correctly installed on the charger or control box you shou...

Страница 20: ...l not function Make sure you do this for both cords If you have checked all the cords and the lift still doesn t move 3 Check the contact points A After you have fully charged the battery and checked...

Страница 21: ...ill not retract if the battery is not fully charged or if the control box is not working The emergency button only overrides the remote in case it has gone bad If this does not retract the lift then c...

Страница 22: ...OCK 1 2 13 16 2 BH 5 8 X 1 1 2 BOLT 316 SS 5 8 11 X 1 1 2 HCS 17 1 BH 5 8 X 5 7 8 18 8 BOLT 18 8 SS 5 8 11 X 5 7 8 HCS CUSTOM 18 2 WF 5 8 WASHER FLAT 5 8 316 SS 19 3 NN 5 8 NUT 316 SS NYLOCK 5 8 11 20...

Страница 23: ...1 SPH 10 X3 4 SCREW 316 SS 10 X3 4 PHSMS 12 1 F 38SB SEAT BELT 2 WIDE BLACK W VELCRO SEAT ASSEMBLY PARTS LIST ACTUATOR ASSEMBLY PARTS LIST ITEM NO QTY PART NUMBER DESCRIPTION 1 1 A 8980PPAF PROPOOLACT...

Страница 24: ...of purchase and installation and the exact nature of the defect Within thirty 30 days after receipt of a written warranty claim by Aqua Creek and barring any unforeseen delays the place of purchase w...

Отзывы: