• Release the operator (
Fig.12
).
• Loosen the fi xing screws of the protective casing of the
operator and remove the casing (
Fig.13
).
• Position the operator on the fi xing slab and anchor in place
using the supplied nuts and washers (
Fig.14-ref.A
).
• Adjust the height with respect to the ground.
• Tighten the nuts using a socket spanner.
5.1-B Fixing with screw anchors
Warning
!
This method for fi xing is allowed only if an horizontal
area of good fi rm cement has already been prepared
where the operator is to be fi xed.
Caution
•
The operator must be well aligned to the sliding gate
and at a correct distance from the resting surface
of the rack (Fig.14).
• Use all the fi xing points (4 holes) to ensure that the
operator is fi rmly anchored to the terrain.
•
Use
SCREW ANCHORS FOR COMPACT MASONRY
(Fischer S 10 RS 100 screw anchors, or equivalent).
• Use a pencil to mark the position of the holes on the
anchoring surface, using the foundation slab as a
template (
Fig.15
).
• Make holes for the screw anchors up to aprox 120 mm
deep (
Fig.16
) (placing the operator in a sheltered place
away from dust).
• Position the operator on the holes, insert the screw
anchors (
Fig.17-Ref.A
) and tighten slightly.
ATTENTION: in order to insert the 4 screw anchors, it may be
necessary removing the power transformer (Fig.17-Ref.B)
by tightening the relevant fi xin screws. Replace the power
transformer at the end of operator fi xing.
• Check the distance between the operator and the gate
(
Fig.15
) before fully tightening the anchor screws.