- EN
5
-
Fig.9
opening
opening
gate
gate
gate
50
90˚
operator
operator
operator
Fig.10
300
A
250
20
Opening
A mm
180 max
70 min
230
170
gate
50
90˚
plate
Fig.11
B
B mm
26 min
136 max
cable pipe
Ø 35 mm
Check the horizontal
position of the plate !
N (4)
English
5.1 FIXING THE OPERATOR
There are two methods for fi xing the operator to the ground:
A-
by means of the foundation slab with 4 anchor log bolts, sunk in cement (the foundation kit);
or:
B-
directly fi xed to the terrain using screws or chemical anchors. This method ONLY can be used if the area is
suffi ciently fi rm and fl at.
Warning
!
Other assembly methods where the motor base is not horizontal are forbidden by the manufacturer.
The operator must be positioned with regard to the position of the closed gate, (
Fig.9
).
5.1-A Fixing with the foundation kit
Fixing with a foundation slab involves laying new
foundations to support the slab.
Fig.10
illustrates the
positions of the foundation.
Warning
!
Leave the correct distance between the edge of the slab
and the gate surface (Fig.10).
Warning
!
The support base for the foundations must be constructed
above the level of the surrounding ground level; if
necessary raise the level a few centimetres.
In very snowy zones or areas subject to flooding we
recommend positioning the plate 10-12 cm above the
ground surface.
Warning
!
It is essential that the foundation works be carried out
perfectly and that the plate be correctly positioned with
respect to the wing.
• Excavate a pit according to the dimensions given in
Fig.10
.
• Before fi lling in the pit, adjust the position of nuts
N
with
respect to slab template, in order to obtain the required
height for the gearmotor in relation to the ground surface
(
ref.B-Fig.11
).
• Fill the pit with good-quality cement (
Fig.11
).
Caution
Check the horizontal position of the plate with a level.
Installation