TABLE A11 - ROUTING THE CABLES IN THE
INSTRUMENT PANEL SUPPORT AREA
•
Connect the instrument panel connec-
tor and check that a click is heard, con-
firming the correct connection.
•
After the CLICK is heard, gently pull the
instrument panel in the direction of the
arrow, so as to tension the cables. If
the connection is connection is correct,
the connector will stay in its place.
TABLE B - FRONT ABS SPEED SENSOR PRE-
FITTING
(OHLINS)
•
After having placed the front ABS
speed sensor on the fork leg, secure
the wiring harness using a cable gland
(1) and a clamp (2).
Electrical system
Tuono V4 1100 Factory
ELE SYS - 114
Содержание 2Q000504
Страница 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Страница 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Страница 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Страница 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Страница 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Страница 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Страница 299: ...INDEX OF TOPICS ENGINE ENG ...
Страница 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Страница 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Страница 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Страница 493: ... Remove the lateral screw Remove the upper screw Remove the chain slider shoe Tuono V4 1100 Factory Chassis CHAS 493 ...
Страница 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Страница 510: ...Operating diagram ABS functional diagram key Braking system Tuono V4 1100 Factory BRAK SYS 510 ...
Страница 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Страница 561: ...INDEX OF TOPICS BODYWORK BODYW ...