TABLE A2 - VEHICLE CABLE HARNESS
Place the relays as indicated:
•
Injection relay (with red reference tape)
on the right support.
•
Fan relay (without taping) on the sup-
port, in central position.
•
Petrol pump relay (with grey reference
tape) on the left support.
Then secure the main wiring harness next to the
grey taping, using cable glands.
TABLE A3 - VEHICLE CABLE HARNESS
•
Completely secure the main wiring har-
ness on the chassis using a clamp next
to with the grey taping.
Electrical system
Tuono V4 1100 Factory
ELE SYS - 122
Содержание 2Q000504
Страница 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Страница 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Страница 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Страница 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Страница 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Страница 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Страница 299: ...INDEX OF TOPICS ENGINE ENG ...
Страница 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Страница 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Страница 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Страница 493: ... Remove the lateral screw Remove the upper screw Remove the chain slider shoe Tuono V4 1100 Factory Chassis CHAS 493 ...
Страница 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Страница 510: ...Operating diagram ABS functional diagram key Braking system Tuono V4 1100 Factory BRAK SYS 510 ...
Страница 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Страница 561: ...INDEX OF TOPICS BODYWORK BODYW ...