![Applent Instruments AT5220 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/applent-instruments/at5220/at5220_user-manual_2954884006.webp)
6
AT5220 User
’
s Guide
1.
Unpacking and Preparation
This chapter describes how to set up and start the AT5220.
•
Incoming Inspection
•
Power Requirements
•
Setting up the Fuse
•
How to Remove the Handle
•
Environmental Requirements
•
Cleaning
1.1
Incoming Inspection
After you receive the instrument, carry it out and check during unpacking according to the
following procedures.
WARNING
If the external face of the instrument (such as the cover, front/rear panel, LCD screen,
power switch, and port connectors) appears to have been damaged during transport, do
not turn on the power switch. Otherwise, you may get an electrical shock.
Make sure that the packing box or shock-absorbing material used to package the instrument
has not been damaged.
Referring to <Packing List> in the packing box, check that all packaged items supplied with
the meter have been provided as per the specified optioned.
NOTE
If an abnormality is detected, contact the company and transport the meter to your
nearest Applent Instruments sales or service office. For inspection by the transport
company, save the packing box, shock-absorbing material, and packaged items as you
received them.
1.2
Power requirements and setting up Fuse
~Line: 220VAC, 50Hz/60Hz
Fuse: 250V 1A Slow Blow
Please use the following fuse type.
UL/CSA type, Slow-Blow, 5
×
20-mm miniature fuse, 1A, 250 V
When you need a fuse, contact your nearest Applent Instruments sales or service office.
To verify and replace the fuse, remove the power cable and pull out the fuse holder.
Содержание AT5220
Страница 24: ...24 AT5220 User s Guide ...