11
Left or Right Hand Operation
operator
Gate in closed position
operator
Gate in closed position
Wiring Instructions
STEP 1.
Determine which side of driveway operator will be installed on. The factory units are
plugged into
INPUT B
for right side installation as shown in
Fig. 1
.
For left side installation, disconnect from INPUT B and plug into
INPUT A
on the surge
board as shown in
Fig. 2
.
Fig. 1
Right Side Installation
Fig. 2
Left Side Installation
Right Side Installation
Red
Black
Green
Orange
White
Left Side Installation
Red
Black
Green
Orange
White