Activating the system: A momentary connection between activation inputs and ground
(GND) is how the system is activated. At the upper left and bottom right of the board
are terminals marked INP or INPUT. These terminals - when momentarily shorted to
ground (GND) - will open, stop and close the gate with each activation. The button on
the side of the box (swing gates ONLY) is connected to these terminals and may be
used to activate the gate when the key is in the horizontal position. On our newest
boards there is an “OPERATE” button at the upper left area of the board that may be
used in the same manner.

6.

HARD SHUTDOWN: If the system has encountered an obstruction two times before
fully opening or closing – the HARD SHUTDOWN LED (upper right of board) will be-
gin flashing – indicating a Hard Shutdown situation. Check to see that any obstruc-
tions are removed from the gates path and then press the “HARD SHUTDOWN RE-
SET” button to restart the system.

7.

Left Hand / Right Hand Operation: All APOLLO Slide Gates are shipped from the fac-
tory wired to close to the left (when looking out of the property). It is suggested to in-
stall and adjust the operator as it comes from the factory – then re-wire the system if
necessary. The easiest way to determine if your system requires re-wiring is to use
the LED Enable button. Once the LEDs are enabled, the OPEN LIMIT light should
come on in the open position and the CLOSED LIMIT light should come on when the
gate is closed. Should these be backwards – make the following changes: If the op-
erator has a left/right input A/input B, move plug to other input. From the MASTER
plug – there are five wires going to a terminal strip… If operator does not have input
A/input B board, reverse the RED with the BLACK - and – reverse the ORANGE with
the WHITE. To verify that the wiring has been changed correctly: Manually move the
gate to the mid-way position and plug the main harness into the EMERGENCY BY-
PASS receptacle – the gate should OPEN. If it closes – the RED and BLACK motor
wires must be reversed. Once it is verified that the EMERGENCY BYPASS does open
the gate – then check the limit switch wiring. Dis-engage the mechanical release and
open the gate fully – verify the OPEN LIMIT led is on. Close the gate fully – verify the
CLOSED LIMIT led. If the limits are backwards – reverse the ORANGE and WHITE
limit wires.

8.

Dual Gate Systems: Test dual gate systems individually. Turn program switch #3 ON
(disables SLAVE side of board) and test actuators one at a time using MASTER side
of board only. Confirm proper operation of each actuator. If both test 100% - then test
together by connecting both actuators and turning program switch #3 to the OFF posi-
tion.

9.

EMERGENCY BYPASS: At the bottom left of the board is the EMERGENCY BYPASS
receptacle. Plugging the operator harness into this receptacle will OPEN the gate
ONLY! It is intended to open the gate(s) should other methods fail. Note that if the mo-
tor draws more than 15 amps of current the fuse above the receptacle will blow. Also,
the gate operator will not stop by its self at the open position. The plug must be re-
moved to stop the gate. (This is also a handy way to test that the current consumption
of the motor is within the normal limits)

10.

FIRMWARE: In the upper right area of the board there is a micro-processor that has a
white label on it. This is the “FIRMWARE” of the system. Currently we are using firm-
ware version V31.00.06. For troubleshooting versions of the firmware earlier than
V31.00.00 consult your original instructions that were included with your system. Sys-
tems that are out of warranty may be upgraded to newer version firmware for a nomi-
nal fee.

TROUBLESHOOTING

Содержание 7200ETL

Страница 1: ...Model 7200ETL INSTALLATION MANUAL APOLLO Gate Operators Inc Post Mounted Residential Heavy Duty Commercial Slide Gate Operator 04 11...

Страница 2: ...ist 5 Parts Identification 6 Operator Installation 7 Chain Bracket Installation 8 Chain Chain Bolt Installation 8 9 Internal Limits 10 11 Quick Release Operation 12 Programming Current Sensing 13 835...

Страница 3: ...rgency access Use the emergency release only when the gate is not moving A secondary entrapment device such as loop detectors edge switches and beam detectors are highly recommended and required to me...

Страница 4: ...rs provide up to 200 operations in the event of power outages The battery may be recharged with a trickle charger or by solar energy Electrical battery chargers should have a class 2 transformer ratin...

Страница 5: ...ine the general location of the operator chian brackets and solar panel if used 1 Is there a suitable location for the operator 2 Can the solar panel if used be mounted in an unobstructed area facing...

Страница 6: ...ps 4 each Master Chain Links 2 each Operator Chain Bolts with hardware 2 each 5 16 x 3 U Bolts 4 each 404C Automatic Battery Charger optional 201 5 Watt Solar Panel Bracket optional 273G CAUTION Signs...

Страница 7: ...nside posts 6 STEP 2 Remove chain cover and front lid Mount to posts using the four supplied 3 U bolts STEP 1 Install two 3 dia Posts parallel to the gate as shown Posts height depends on height prefe...

Страница 8: ...ate using the supplied 2 U bolts Do not tighten at this time STEP 4 Attach the chain to the chain bolt using the master chain link Adjust the chain bolt to allow for maximum tightening Note The height...

Страница 9: ...ed length of chain needed to attach to the chain bolt and still allow adjustment Using a chain breaking tool not provided remove excess chain Attach chain to chain bolt Tighten all chain brackets and...

Страница 10: ...te moving to the left less travel more travel Limit adjustment for right Movement gate moving to the right less travel more travel Step 4 Adjust the corresponding limit switch for preferred close posi...

Страница 11: ...installed on The factory units are plugged into INPUT B for right side installation as shown in Fig 1 For left side installation disconnect from INPUT B and plug into INPUT A on the surge board as sho...

Страница 12: ...12 QUICK RELEASE OPERATION Engaged Engaged Pull turn 1 2 inch to disengage...

Страница 13: ...ce All limits should be set before beginning this procedure This new procedure applies to revision 31 or higher firmware 1 Press and hold the LED ENABLE button for five seconds The STOP LED will blink...

Страница 14: ...Indicators Optional Device Input Remote Monitor Outputs and Photo Eye GateLink Connector Microprocessor Timer To Close Dual Gate Delay Current Sensitivity Adjustments Program Switches 835 836 Control...

Страница 15: ...835 836 board Connect the relay wires of the accessory as normal COM to GND NO to SAFETY 14 for a safety device When the gate operator begins opening comes off of the closed limits the MAS terminal wi...

Страница 16: ...roubleshooting Hold the push button down for five seconds to put the board in program mode RESET Resets the microprocessor Returns processor to last known state OPERATE When depressed activates the ga...

Страница 17: ...utton released 6 LOCK TYPE For 12V mechanical solenoid locks For 12V magnetic locks 12V for 4 seconds on open cycle 12V when on close limit 7 COAST ENABLE Gate will stop immediately when at Gate will...

Страница 18: ...ion see program switch 5 for options OPEN Open input from a 3 button station see program switch 5 for options GND Supplied Battery Ground GND Supplied Battery Ground FREE EXIT Opens gate if closed sto...

Страница 19: ...or on the Remote Monitor Output Connector block Connect the black wire to the GND connector on the Remote Monitor Output Connector block Red Black Set Program Switch 4 as preferred ON Upon activation...

Страница 20: ...code switches for proper operation If power is taken directly from battery or connected as shown below receiver should be configured for 12VDC Multi Code Digi Code Allstar Lift Master black gray gray...

Страница 21: ...NGLE GATE 1 2 3 5 ON all others OFF DUAL GATE 1 2 5 ON all others OFF 3 LED ENABLE BUTTON On the right side of the board half way down is the LED ENABLE button Pressing this button once and releasing...

Страница 22: ...the BLACK and reverse the ORANGE with the WHITE To verify that the wiring has been changed correctly Manually move the gate to the mid way position and plug the main harness into the EMERGENCY BY PAS...

Страница 23: ...improper power source or if damage was caused by fire flood or lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In ca...

Отзывы: