Gearmotor for swing gates
ATS30DGSATS50DGS
ATS30DGR
INSTALLATION MANUAL
FA01338-EN
EN
English
Страница 1: ...Gearmotor for swing gates ATS30DGS ATS50DGS ATS30DGR INSTALLATION MANUAL FA01338 EN EN English...
Страница 2: ...1 2 3 1 2 3 4...
Страница 3: ...c Make sure you have set up a suitable dual pole cut off device along the power supply that is compliant with the installation rules It should completely cut off the power supply according to category...
Страница 4: ...egies Simply follow these brief disposal guidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Befo...
Страница 5: ...ible telescopic gearmotor 24 V with encoder for swing gates with Max C up to 200 mm with leaf up to 5 m and 400 kg Grey RAL7024 801MP 0110 ATS30DGR Irreversible telescopic gearmotor 24 V with encoder...
Страница 6: ...ressure level dB A 70 70 70 Protection rating IP 54 54 54 Insulation class I I I Reduction ratio i 28 28 28 Weight kg 7 5 8 7 5 Cable types and minimum thicknesses Cable length m up to 20 from 20 to 3...
Страница 7: ...r fitting the operator and accessories varies depending on the area where it is installed It is up to the installer to find the most suitable solution The drawings refer to a gearmotor installed on th...
Страница 8: ...af to 90 or 120 First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indicated in the table A C B 60 60 E F 5 ATS30DGS AT...
Страница 9: ...thout notice Translation of the original instructions Fastening the brackets Secure the post bracket with plugs and screws The holes on the bracket fixing plate allow you to vary the opening angle of...
Страница 10: ...anged at any time and without notice Translation of the original instructions Fastening the gearmotor Lubricate all moving parts on the operator A The self locking nut must be loosely tightened so as...
Страница 11: ...CAL CONNECTIONS Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmot...
Страница 12: ...roswitch 10 mm in either direction turn the rod 20 times Determining the opening end of travel points Release the gearmotor Open the gate manually Send an opening command At the same time turn the rod...
Страница 13: ...blishing the bracket fastening points Close the gate manually First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indica...
Страница 14: ...cal connections Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmot...
Страница 15: ...d of travel points Release the gearmotor Open the gate manually Send an opening command At the same time turn the rod for determining the opening end of travel point ANTICLOCKWISE until the gearmotor...
Страница 16: ...p 16 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions FINAL OPERATIONS 1 2...
Страница 17: ...f the system is not used for long periods of time e g for installations at sites with seasonal closures disconnect the power supply When the power supply is reconnected check the system is working cor...
Страница 18: ...p 18 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...
Страница 19: ...p 19 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...
Страница 20: ...ME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions CAME S p A Via Martiri della Libert 15 31030 Dosson di Casier Treviso Italy...