PAD INSTALLATION
Pad Location
Driveway
Direction of Opening
12”
24”
24”
5”
The required depth of the
pad will vary from site to
site. Normally, the pad
should be at least 4” above
the surface and 18” below
(Figure A & B).
Fig. A
Fig. B
In harder soil or rock, pilings may be preferred (Figure C).
Conduit requirements should be considered in the planning stage. If electrical power is required, a separate conduit should be
installed for electrical only. A certified electrician should be consulted for the proper conduit material (Figure D & E).
Fig. C
Fig. D
AREA FOR CONDUIT
ENTRY
3”
14”
5”
Fig. E
Note:
Allow the
concrete to cure
as per the
directions on the
bag. The
mounting holes
for the operator
should be drilled
after the concrete
has cured.
6
Pad Location