background image

IMPORTANT - READ CAREFULLY BEFORE BEGINNING INSTALLATION 

 

WARNING—To reduce the risk of injury or death: 

 

Read this installation manual completely prior to installation. 

Installation should be performed by a professional installer. 

Required welding should be performed by a qualified welder. 

Should electricity be required, use a certified electrician only. 

Any device that requires 120 Volts AC should be U.L. approved. 

Review with the owner all safety concerns including: 

 

Do not operate the gate unless area around gate is in full view. 

Do not allow children or adults to “ride” on gate during operation. 

Do not allow children to play in the gate area. 

Periodically test the obstruction sensitivity to assure safe and 
proper operation. **Do not test sensitivity by standing between the 
gate and the hinge or stop post.
 

Keep the remote control away from children. 

The “CAUTION AUTOMATIC GATE” sign should be clearly visible 
from both sides of the gate. 

Always insure that the gate has closed securely before leaving 
area. 

Arrange with local fire and law enforcement for emergency access. 

Always keep people and objects away from the gate. No person 
should cross the path of the moving gate. 

 

Recommend safety devices such as loop detectors, edge switches, and 
beam detectors when applicable. 

Install control devices such as keypads far enough away (5 feet or further) 
from any moving parts of the operator and gate to prevent possible injury. 

Always disconnect the battery or power source when making adjustments 
or repairs to any part of the gate or operator. 

All rollers should be covered to prevent injury. 

 
Test the gate operator monthly.  The gate must reverse on contact with a rigid 
object or stop when an object activates the non contact sensors. After adjust-
ing the force or limit of travel, retest the gate operator.  Failure to adjust and 
retest the gate operator properly can increase the risk of injury or death. 

IMPORTANT SAFETY PRECAUTIONS 

Содержание 7100UL

Страница 1: ...Model 7100UL INSTALLATION MANUAL 10 04 00 Gate Operators Inc Residential Medium Duty Commercial Slide Gate Operator...

Страница 2: ...5 Pad Installation 6 Operator Installation 7 Chain Bracket Installation 8 Chain Chain Bolt Installation 9 Chain Magnets Installation 10 Quick Release Operation 11 Control Board Connections 12 Control...

Страница 3: ...TOMATIC GATE sign should be clearly visible from both sides of the gate Always insure that the gate has closed securely before leaving area Arrange with local fire and law enforcement for emergency ac...

Страница 4: ...vide up to 200 operations in the event of power outages The battery may be recharged with a trickle charger or by solar energy eliminating the need for costly trenching to remote entrances If a trickl...

Страница 5: ...e the general location of the operator chian brackets and solar panel if used 1 Is there a suitable location for the operator 2 Can the solar panel if used be mounted in an unobstructed area facing so...

Страница 6: ...Wraps 4 each 404 1 5 Amp Automatic Battery Charger optional 40 Link Master Chain Links 2 each 7100UL Operator 5 16 Washers Lock Nuts Nuts 8 each 5 16 X 2 5 16 U Bolts 4 each 201 208 5 Watt Solar Pane...

Страница 7: ...red Figure C Conduit requirements should be considered in the planning stage If electrical power is required a separate conduit should be installed for electrical only A certified electrician should b...

Страница 8: ...chassis The holes should be drilled with a 1 2 concrete drill bit STEP 1 Set the operator on the pad as shown Align the sprockets 3 to 5 inches from the inside surface of the gate STEP 2 Mark the four...

Страница 9: ...each end of the gate as shown Do not tighten at this time STEP 2 Align the left chain bracket slot with the top teeth of the idler sprocket Idler Sprocket Main Sprocket STEP 3 Align the right chain b...

Страница 10: ...nds of the gate STEP 2 Attach the chain to the chain bolt using the master chain link Note A chain breaking tool may be required to reduce the chain to the proper length Chain Path Fig A Fig B TIP If...

Страница 11: ...per open close limits WARNING Always disconnect battery prior to relocating the magnet Chain Path Switch Magnet Switch Magnet Operator Top View Right Side Front View Switch Magnet Switch Magnet 10 1 2...

Страница 12: ...QUICK RELEASE OPERATION Engaged Engaged Pull turn 1 2 inch to disengage 11...

Страница 13: ...ng close cycle 4 RED Motor Negative during open cycle Positive during close cycle 5 GREEN Ground Limit Switch Common 6 NOT USED 7 BLACK Ground Battery Negative 8 RED Battery Positive 12 VDC 8 6 4 2 7...

Страница 14: ...TELLIGENT ACTUATOR ENABLE ON Controller is connected to Intelligent actuator 816E 816EX OFF Controller is connected to slide gate or other type of actuator TIMER TO CLOSE ADJUSTMENT When Switch 1 is O...

Страница 15: ...ller is initially installed it must be put into learn mode The gate should be fully opened and closed 3 5 times and partially opened and closed 3 5 times to allow the controller to adjust to the weigh...

Страница 16: ...GND INP 12V black yellow red GND INP 12V GND INP 12V white silver common n o white gold 4 3 2 1 white black red white Do not confuse the receiver code switches with the red program switches on the gat...

Страница 17: ...tion to improper power source or if damage was caused by fire flood or lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective part...

Отзывы: