11
INSTALLING SWING ARMS
•
Locate the 4 swing arms and swing arm pins. Take one of the arms and insert it over the hole in the carriage torsion
tube. Line up the holes and insert the pin. Repeat for the three other arms.
ELECTRICAL CONNECTION
HAVE A QUALIFIED ELECTRICIAN HOOK THE MAIN ELECTRICAL POWER CONNECTION TO THE
POWER UINT ON THE LIFT. FOLLOW LOCAL CODES IN YOUR AREA.
•
The electricity is to be hooked up at the power unit. This is 220volt single phase power unit. There is one cluster with three
wires out of motor.
•
Yellow/Green is ground wire. Blue is Live 1. Brown is Live 2. (If 220volt circuit is from one hot and one neutral, please
wire blue to neutral)
•
The power supply to the lift should be 220 Volt with a 30amp breaker.
•
If wire length less than 10mm, wire size should be 2.5MM2. If wire length more than 10mm wire size should be 4MM2
•
Diagram of electrical system for single phase MOTOR
M1-Motor KM-Contactor SB-Button SQ-Limit Switch
HYDRAULIC FLUID
•
Remove the vent plug from the top of reservoir. You are going to fill the tank with fluid. Either AW 32 or 46 Hydraulic oil
is good choice. We don't recommend the transmission fluid as it is too thin. The unit will hold approximately 2.64
gallons(10 liters) of fluid.
ADJUSTING CABLES
•
Place a pair of small or medium vise grips around the shoulder of the long threaded adjusting bolt on the cable to
make any adjustments.
•
Use a deep socket to adjust the slack out of the cable. Adjust tension to cables equality.
DO NOT over tighten. Note: If one of the cables is tighter than the other, the carriage will go up uneven.
These
should be tightened like a Banjo String or Fan Belt.
ADJUSTING & SYNCHRONIING THE CARRIAGES
•
One of the most important things to remember is not to tighten down one side more than the other. The key is to
Содержание HW-9KOH
Страница 3: ...3 Caution Labeling Exemplification...
Страница 4: ...4 TABLE OF CONTENTS 1 INTRODUCTION 2 INSTALLATION OPERATION 3 MAINTENANCE SAFETY...
Страница 6: ...6 Fig 1 Diagram...