5
1.
Introduction
PARTS LIST
QTY
Part description
1
Top beam (two stages plus one
connector)
Please connect Beam on
ground
10
Hex bots, washers & nuts for two-stages
beam
M10x30
8
Hex bolts, washers & nuts for beam
mounting to columns
M10x30
1
Overhead Safety Bar
1
Switch bracket for Overhead safety bar
(power unit side)
1
Long bolt for Overhead safety Bar
M6x130 (offside)
2
Top columns extensions
2
Columns
16
Hex Bolts, washers & nuts for column
extensions mounting to columns
4
lift arms
4
Arm pins
Connect arms to carriage
1
Power Unit 220 Voltage, single phase
w/ manual release handle
4
Bolts, washers & nuts for power unit
mounting to column
M8X20
1
Hydraulic hose long
30’
1
Hydraulic hose short
3-1/2 FT
1
Power Unit Hydraulic Tee Fitting
Installed to power unit for
two hoses hooking
2
4.3 inches Extended Fitting to cylinder
For two hoses hooking
2
Truck adapter sets
4 drop-in pads, 4 short, 4
high
2
Wire rope equalizer cables w/ M18
thread on nuts & washers
10
Anchor Bolts for two columns
M18x160
Содержание HW-9KOH
Страница 3: ...3 Caution Labeling Exemplification...
Страница 4: ...4 TABLE OF CONTENTS 1 INTRODUCTION 2 INSTALLATION OPERATION 3 MAINTENANCE SAFETY...
Страница 6: ...6 Fig 1 Diagram...