background image

 

 

1.

 

Introduction 

PARTS LIST 

 

 

 
 
 
 
 

 

 

 
 
 
 
 

 

 

QTY 

Part description 

 

Top beam (two stages plus one 
connector) 

Please connect Beam on 
ground 

10 

Hex bots, washers & nuts for two-stages 
beam 

M10x30 

Hex bolts, washers & nuts for beam 
mounting to columns 

M10x30  

 

Overhead Safety Bar 

 

Switch bracket for Overhead safety bar 

(power unit side) 

Long bolt for Overhead safety Bar  

M6x130 (offside) 

 

Top columns extensions 

 

Columns 

 

16 

Hex Bolts, washers & nuts for column 
extensions mounting to columns 

 

 

lift arms 

 

Arm pins 

Connect arms to carriage  

 

 

 

 

 

 

 

 

 

 

Power Unit 220 Voltage, single phase 
w/ manual release handle 

 

Bolts, washers & nuts for power unit 
mounting to column 

M8X20 

 

Hydraulic hose long 

30’ 

Hydraulic hose short 

3-1/2 FT 

Power Unit Hydraulic Tee Fitting  

Installed to power unit for 
two hoses hooking 

4.3 inches Extended Fitting to cylinder 

For two hoses hooking 

 

Truck adapter sets  

4 drop-in pads, 4 short, 4 
high 

 

Wire rope equalizer cables w/ M18 
thread on nuts & washers 

 

 
10 

Anchor Bolts for two columns 

M18x160 

 

 

 

Содержание HW-9KOH

Страница 1: ...1 INSTALLATION MANUAL OPERATION INSTRUCTIONS OVERHEAD CAR LIFT 2 POST LIFT AUTO HOIST APlusLift HW 9KOH...

Страница 2: ...rface Only on concrete surface a minimum of 4 thick and 3 500 psi tensile strength with steel or fiber mesh reinforcement DO NOT install this lift over concrete expansion joints or cracks Check with y...

Страница 3: ...3 Caution Labeling Exemplification...

Страница 4: ...4 TABLE OF CONTENTS 1 INTRODUCTION 2 INSTALLATION OPERATION 3 MAINTENANCE SAFETY...

Страница 5: ...mns 16 Hex Bolts washers nuts for column extensions mounting to columns 4 lift arms 4 Arm pins Connect arms to carriage 1 Power Unit 220 Voltage single phase w manual release handle 4 Bolts washers nu...

Страница 6: ...6 Fig 1 Diagram...

Страница 7: ...7 Fig 2 Minimum size of a SLAB L100 x W216 x H6 3000PSI Or Two concrete footings 2 ft x 2 ft with 30 deep 3000PSI...

Страница 8: ...are inside the columns or banded to the columns Remove the power unit box four swing arms from the lift next remove the bolts holding the two columns together Remove the top column from the bottom col...

Страница 9: ...the cylinders are properly seated into the cylinder hole in the base plate If they are the round part of the cylinder will be sitting down on the steel flat Take the equalizer cables Using vise grips...

Страница 10: ...Connect the short hose to 4 3 inches extended fitting in bottom of cylinder Connect Long hydraulic hose to the TEE fitting in power unit Run the long hose up the side of column Run the hose cross the...

Страница 11: ...wire length more than 10mm wire size should be 4MM2 Diagram of electrical system for single phase MOTOR M1 Motor KM Contactor SB Button SQ Limit Switch HYDRAULIC FLUID Remove the vent plug from the to...

Страница 12: ...e almost at the same time with each side When cables are adjusted properly they should be fairly tight DUAL POINT LOCK RELASE Figure 5 FINAL ASSEMBLY Check all bolts and nuts to make sure they are tig...

Страница 13: ...proper weight distribution center of gravity should be midway between adapters Swing arms under vehicle to allow adapters to contact at the manufacturer s recommended pick up points Use caution before...

Страница 14: ...all bolts and nuts every six months Hydraulic Oil If your lift will raise all the way to the top of the hydraulic tank is full of hydraulic oil The hydraulic oil should be changed once a year along w...

Страница 15: ...ds Never use lift to raise one end or side of vehicle Always raise vehicle about 3 and check stability by rocking vehicle Prior to lowering vehicle walk around the lift and check for any objects that...

Страница 16: ...ASE OPERATION IMMEDIATELY Inspect correct and or replace parts as required Daily Pre Operation Check 8 Hours 1 Check safety lock audibly and visually while in operation 2 Check safety latches for free...

Страница 17: ...d rollers Replacement of cables and sheaves Replacement or rebuilding air and hydraulic cylinders as required Replacement or rebuilding pumps motors as required Checking of hydraulic cylinder rod and...

Отзывы: