APCom AITCE31-119 Скачать руководство пользователя страница 5

5

 

 

 

V.  PHASE CONVERSION

    A.  IMMERSION THERMOSTAT MODEL

     

THREE PHASE TO SINGLE PHASE

    1.  Disconnect blue wires and yellow wires from terminal L-3.

    2.  Connect all blue wires to terminal L-1 (with black wires).

    3.  Connect all yellow wires to terminal L-2 (with red wires).

    4.   Incoming power will be connected to 

     

terminals L-1 and L-2 at job site.

   

   

   

 

  B.  IMMERSION THERMOSTAT MODEL 

     

SINGLE PHASE TO THREE PHASE

  1.  Disconnect blue wires from terminal L-1.

  2.  Disconnect yellow wires from terminal L-2.

  3.  Connect all blue wires and yellow wires to terminal L-3.

  4.  Incoming power will be connected to terminals 

     

L-1, L-2 and L-3 at job site.

IMMERSION THERMOSTAT MODEL TRANSFORMER

 

IMMERSION THERMOSTAT MODEL

SINGLE PHASE TERMINAL BLOCK

 

IMMERSION THERMOSTAT MODEL

 THREE PHASE TERMINAL BLOCK

IMMERSION THERMOSTAT MODEL  TRANSFORMER 

CONNECTION TABLES

 

Volts 

Line On 

Load on

 

208 

Common & 208

 

240 

Common & 240  Secondary

 

277 

Common & 277 

  120V

 

480 

Common & 480

480

277

240

208

CO

M

Содержание AITCE31-119

Страница 1: ...r S And Models A STCE31 50 80 119 A ITCE31 50 80 119 Commercial Electric Water Heaters CAUTION TEXT PRINTED OR OUTLINED IN RED CONTAINS INFORMATION RELATIVE TO YOUR SAFETY PLEASE READ THOROUGHLY BEFOR...

Страница 2: ...ar the electrical system of the heater Never touch electrical components with wet hands or when standing in water REQUIRED ABILITY CONVERSION OF ANY WATER HEATER LISTED IN THIS MANUAL REQUIRES ABILITY...

Страница 3: ...eting the unit conversion CONVERSION KIT NUMBER TABLE Models Allowed For Conversion Desired Input Conversion Kit No At Desired Voltage Total KW Element KW 208V 240V 277V 480V CSB or I S TCE models wit...

Страница 4: ...elements to appropriate storage bin C Open the appropriate conversion kit and remove the elements Check each element to ensure correct voltage and wattage D Install the new element starting it by hand...

Страница 5: ...HASE TO THREE PHASE 1 Disconnect blue wires from terminal L 1 2 Disconnect yellow wires from terminal L 2 3 Connect all blue wires and yellow wires to terminal L 3 4 Incoming power will be connected t...

Страница 6: ...L 3 5 Incoming power will be connected to terminals L 1 L 2 and L 3 at job site VI CAUTION Recheck all terminals for tightness proper wiring per schematic and neatness of wiring Heater should be no l...

Страница 7: ...HIPPING CRATE Close and tape the plastic flap on front of crate CHECK LIST All affected parts have been installed properly and have been checked for tightness All affected wires have been checked for...

Страница 8: ...SO WILL DAMAGE INTERNAL PARTS OHMS RESISTANCE TABLE VOLTAGE WATTAGE 208 240 480 2000 21 63 28 80 115 20 3000 14 42 19 20 76 80 4000 10 82 14 40 57 60 4500 9 61 12 80 51 20 5000 8 65 11 52 46 08 6000 7...

Страница 9: ...9 NOTES...

Страница 10: ...10 NOTES...

Страница 11: ...11 NOTES...

Страница 12: ...12 125 Southeast Parkway Franklin TN 37068 1 800 433 2545 apcom inc com...

Отзывы: