CONVERSION INSTRUCTIONS

REQUIRED ABILITY

CONVERSION OF ANY WATER HEATER LISTED IN THIS MANUAL REQUIRES ABILITY EQUIVALENT 

TO THAT OF A LICENSED ELECTRICAL TRADESMAN

I.   INTRODUCTION

Satisfying a customer order for a commercial electric heater from inventory may require modification to the KW input, 

the voltage, or the phase. Conversions may involve revision to 1, 2, or all 3 of these electrical characteristics.

II.   HEATER PREPARATION

The heater should be placed in a well lit area.  Complete removal of the shipping crate is not  required.  The front of the 

heater with the control box will be visible through the clear plastic. Cut a 3-sided flap into the plastic, cut should be on 

top, bottom and right side approximately 4” from the wooden edge. 

Release the two control panel screws and unlatch with knob on the water heater door.

To expose elements, remove the foam door covering directly in back of the control panel door.  

Remove the T & P valve (separate package).

III.  KW CONVERSION (ELEMENT REPLACEMENT)

 

A.    Remove wires from one element at a time. It is not necessary to tag loose wires as the wiring schematic is 

inside  the control panel door.

 

B.  Remove element from heater using part no. 9000429015 or 1-1/2” deep well socket and ratchet.  Return the 

elements to appropriate storage bin.

 

C.  Open the appropriate conversion kit and remove the elements.  Check each element to ensure correct voltage 

and wattage.

 

D.  Install the new element, starting it by hand.  A new “O” ring gasket should be installed on each element.  Element 

threads should be lubricated with Dow Corning®

 silicon sealant (or equal). Screw element into fitting until it 

seats. Tighten 1/2 to 3/4 turn with wrench.

 

 

E.  Rewire the element as directed on wiring schematic, located inside control panel door.  Screw terminals must be 

snug, however, caution must be exercised.  Overtightening may break the terminal block, requiring replacement 

of the element.

 

F.  Repeat steps A thru E for all other elements being replaced.

IV.  VOLTAGE CONVERSION

 

A.  Surface thermostat models merely require installation of the appropriate elements to accomplish a change in 

voltage.  See KW conversion step III.

 

B.  Immersion  thermostat  models  require  installation  of  the  appropriate  elements AND  may  also  require  a 

transformer   tap change.  Immersion thermostat models are equipped with a transformer having 5 connections: 

common, 208,  240, 277 and 408 and 2 secondary connections.  See the following diagrams.

 

 

Only one wire need be changed on the transformer to change voltage.  Remove the wire from the terminal 

marked 208, 240, 277 or 480 and attach it to the appropriate terminal marked 208, 240, 277 or 480.

    C.  Do not change the common connections or the secondary wire connections.

Содержание AITCE31-119

Страница 1: ...r S And Models A STCE31 50 80 119 A ITCE31 50 80 119 Commercial Electric Water Heaters CAUTION TEXT PRINTED OR OUTLINED IN RED CONTAINS INFORMATION RELATIVE TO YOUR SAFETY PLEASE READ THOROUGHLY BEFOR...

Страница 2: ...ar the electrical system of the heater Never touch electrical components with wet hands or when standing in water REQUIRED ABILITY CONVERSION OF ANY WATER HEATER LISTED IN THIS MANUAL REQUIRES ABILITY...

Страница 3: ...eting the unit conversion CONVERSION KIT NUMBER TABLE Models Allowed For Conversion Desired Input Conversion Kit No At Desired Voltage Total KW Element KW 208V 240V 277V 480V CSB or I S TCE models wit...

Страница 4: ...elements to appropriate storage bin C Open the appropriate conversion kit and remove the elements Check each element to ensure correct voltage and wattage D Install the new element starting it by hand...

Страница 5: ...HASE TO THREE PHASE 1 Disconnect blue wires from terminal L 1 2 Disconnect yellow wires from terminal L 2 3 Connect all blue wires and yellow wires to terminal L 3 4 Incoming power will be connected t...

Страница 6: ...L 3 5 Incoming power will be connected to terminals L 1 L 2 and L 3 at job site VI CAUTION Recheck all terminals for tightness proper wiring per schematic and neatness of wiring Heater should be no l...

Страница 7: ...HIPPING CRATE Close and tape the plastic flap on front of crate CHECK LIST All affected parts have been installed properly and have been checked for tightness All affected wires have been checked for...

Страница 8: ...SO WILL DAMAGE INTERNAL PARTS OHMS RESISTANCE TABLE VOLTAGE WATTAGE 208 240 480 2000 21 63 28 80 115 20 3000 14 42 19 20 76 80 4000 10 82 14 40 57 60 4500 9 61 12 80 51 20 5000 8 65 11 52 46 08 6000 7...

Страница 9: ...9 NOTES...

Страница 10: ...10 NOTES...

Страница 11: ...11 NOTES...

Страница 12: ...12 125 Southeast Parkway Franklin TN 37068 1 800 433 2545 apcom inc com...

Отзывы: