1. Install the ionizing air blower and the matching power adapter firmly in the best discharg
e
position.
2. Insert the power network cable into the adapter and the ionizing air blower RJ45 network port, and insert the
national standard power cable of the adapter into the row socket.
3. Touch the power switch on the front panel of ionizing air blower. It will automatically brush the needle after
starting and the fan works normally when the indicator light is green.
Installation steps
1. Place the ionizing air blower in the work area where static electricity is to be eliminated and the installation angle
is perpendicular to the surface of the charged body.
2. Ionizing air blower should be at least 300mm away from the metal conductor and metal grounding body. The
ionizing air blower must be reliably connected to the ground wire.
3. Two ionizing air blowers should be installed side by side with an interval of more than 400mm and more than
200mm away from obstacles such as walls.
Technical tips
Wall
Wall
Wall
Packing accessories
Part name
Picture
Part No.
Specification
Q'TY
Power adapter
OSP000601
GRT-240200
:
DC24V 2A
,
Dual-port output
,
size
:
123*61*40.5mm
(
L*W*H
)
1
National standard
power cord
8YXG25110
Standard 1.8m
,
Optional 3m/5m
1
Power cable
8WXI00004
Standard 2.5m
,
Optional 5m/10m
1
Remote control
AP2253011
IR remote control
,
84×38mm
1
Products Use
Installation steps/technical tips/Installation accessories
4. The air inlet is at least 150mm away from the wall.