1. Choose the best static elimination position and install the bar body and the matching power adapter firmlyafter the static detection of the on-site
working environment. The installation angle should be perpendicular to the surface of the charged body, and the installation distance can be referred
to the following table. (Ex-work setting is 30Hz. Use the remote control to adjust if you need to adjust the output frequency. Configure a flat panel
tester if you want to see the adjustment results).
Working frequency(Hz)
Installation distance(mm)
55
100
30
100
10
150
5
200
1
250
Installation position
2. The ion bar grounding electrode is not allowed to be covered by other objects.
3. It is advisable to install two ion bars side by side with an interval of more than 300mm.
Two ion bars should be staggered by more than 300mm if they are to be installed face to face.
4. It is advisable to be more than 200mm away from obstacles such as walls.
5. For the safe use of the ion bar, the ion bar discharge electrode should be at least 30mm away from the metal conductor and metal
grounding body and the bar body must be reliably connected to the grounding wire.
6. The installation angle of the ion bar can be adjusted.
≥ 100mm
≥ 100mm
60-200mm
Metal conductor
Metal conductor
Metal conductor
Metal conductor
W
ALL
W
ALL
W
ALL
W
ALL
Charged object
Содержание AP-AB1215
Страница 3: ...High efficient Safe Static removal...