7
ASSEMBLY and PREPARATIONS
A. Main Station and Hot Air Gun Stand
B. Soldering Iron
1. Follow instructions on “Soldering Iron Stand Assembly ” on page 5.
2. Connect the soldering iron cord assembly to the soldering iron output
terminal found at the lower middle portion of the main unit.
3. Place the soldering iron to the soldering iron stand.
C. Pre-heater
1. Screw in PCB Holder using Securing Screw on desired position.
2. Adjust multipurpose PCB holder to accommodate PCB shape.
D. Hot Air Gun
To set up the Hot Air Gun stand:
1. Use the 8 mm screw to secure the holder to the station.
2. Place the hot air gun onto the stand in preparation for usage.
1 . D e t a c h
screw from
hot air gun
mast.
2. Inset mast into base.
3. Insert screw and
lock mast into posi-
tion.
4. Slide in holder
stopper and hot air
gun arm holder.
Adjust height and
screw to lock.
Содержание INT866
Страница 19: ...19...