
Connectivity
Made Easy
Page 89 of 164
4.
Compress attachment using ZIP – To compress the selected
reports using ZIP to be attached in the email.
5.
Back-up selected reports to … - To back up the selected reports in
/backup/reports FTP directory.
6.
Perform selected task(s) on record … - Specify how old records
should be before they are deleted/emailed/backed up.
Figure 6-3 Maintenance Tasks
Figure 6-4 shows the interface for specifying the frequency of the tasks to be
performed on the selected logs. The selected tasks can be scheduled daily,
weekly or monthly.
Figure 6-4 Maintenance Schedule
Click button
to view the advanced setting as shown in Figure 6-5.
1.
Do not format duration field into … - To change the duration
format in the reports into readable format “hrs-mins-secs”.
Содержание InnGate 3 E-series
Страница 1: ...INNGATE 3 ADMINISTRATOR S MANUAL DOCUMENT RELEASE 1 01 ...
Страница 49: ...Connectivity Made Easy Page 49 of 164 Figure 2 22 Auto Logout ...
Страница 91: ...Connectivity Made Easy Page 91 of 164 Figure 6 7 Test Posting Log Click button to clear the log ...
Страница 132: ...Connectivity Made Easy Page 132 of 164 Figure 8 28 Change of Telnet Console Password ...