
q
Connect LOAD, Press ENTER
The Site Master then measures the 50
W
termina-
tion (load) that you must attach to the end of the
test port or transmission line.
NOTES:
The order of the “Open,” “Short,” and “Load” meas-
urements can be changed or the selection repeated
using the Up/Down Arrow Key.
The combined measurements of an open, a short,
and a known-impedance load normalizes the meas-
urement system, to account for uncertainties intro-
duced by measurement-system components (e.g.,
cables, connectors, etc.).
Up/Down
Arrow Key
Increments or decrements a parameter value.
2 - 5
Chapter 2 Operation
Содержание Site Master S112
Страница 3: ......
Страница 15: ...This page is intentionally blank 1 7 Chapter 1 General Information...
Страница 52: ...2 36 Chapter 2 Operation Figure 2 10 Maximum Distance and Resolution vs Frequency Span...
Страница 81: ...3 14 Chapter 3 Screen Capture Program NOTES...
Страница 83: ......