![Ankom TDF28 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/ankom/tdf28/tdf28_service-procedure_2944725007.webp)
In-Line Heater Replacement
(TDF28/28.1)
TDF
ANKOM Technology ● 2052 O’Neil Road ● Email: [email protected] ● Phone: 315-986-8090 ● Fax: 315-986-8091
Service procedure
TS018
Rev. B
6/04/2018
Page 7 of 10
26. On the lower end of the same set of <ed cables
from step 27 above, cable <e the 6 cables to the
1 control box cable. There should be 7 cables
altogether. Carefully trim excess cable <e
without damaging any insula<on.
25. Fasten the white thermistor wire from the In-Line
Heater to the 4 cables from the supply valves and
the gray cable from the Pressure Sensor with a
cable <e. There should be 6 wires altogether.
Carefully cut off the excess cable <e without
damaging any insula<on.
24. Reconnect the J10 connector onto the bo=om
leK prongs on the MUX-T circuit board.
27. Slide two Z462 cable holders onto the In-Line
Heater cable (Blue Arrows). Insert the cable
holders onto the 2 PEM studs underneath the
In-Line Heater (Red Arrows). Screw the two
remaining nuts back on, securing the bracket.
make sure the star washers are facing inside.