background image

18IP22B

54

Remove the pin connecting the modulating air damper to its
actuating arm at the modulating valve by releasing the clip.
Remove the pilot supply pipe by releasing the union nut at each
end. Unscrew the four screws that secure the modulating valve
to its flange connection on the gas manifold being careful not to
loose the "O" ring, and withdraw the gas train from its locating
slot in the burner trolley, the various controls in the main gas
train can now be replaced by unscrewing from the gas train.
The pilot solenoid valve can also be unscrewed at its outlet
connection and replaced.
An approved thread sealant should be used when re-connecti-
ng any pipe threads. Ensure that any controls replaced are
fitted squarely on the gas train, the "O" ring seal on the outlet of
the modulating valve is in good condition and correctly located
and the modulating valve drive shaft and linkages are correctly
assembled.

Upon replacement if components carry out the relevant portions
of section 6 commissioning.

Control panel components

Release the fixing screws from the cover of the electrical con-
nection tray.
Refer to fig. 25 for the locations of the various controls.
Replace components by removing electrical connections and
screw fixings.

Ignition generator

Release the two screws at each side of the cover lid. Discon-
nect the ignition transformer electrical connection from within
the electrical connection tray and release the ignition electrode
lead from the transformer. Replace the transformer by releasing
its screw fitting and reconnect the electrical connections ac-
cording the separate supplied wiring diagram.

The control thermostat RWF40 is fixed to the left or right hand
side of the electrical connection tray and its fixing screws can
be accessed via bottom of the electrical connection tray.
Re-connect any electrical connections in accordance with the
separate supplied wiring diagrams.

It is necessary to drain the water heater when replacing the
water flow switch as it incorporates water connections.
The temperature sensing phials for both the limit thermostat
and the high limit thermostat are contained within a thermostat
pocket in the flow header. The phials are released by first
removing the securing clip.

Содержание R18 Series

Страница 1: ...18IP22B Technical documentation R18 Water Heaters Andrews Water Heaters Wednesbury One Black Country New Road Wednesbury West Midlands WS10 7NZ Telephone 0121 506 7400 Facsimile 0121 506 7401...

Страница 2: ...otherwise without the prior permission in writing of Andrews Water Heaters We aim to achieve continuous improvement in our products Therefore specifications are subject to change without prior notice...

Страница 3: ...6 DN80 PN16 DN80 PN16 DN80 PN16 Pressure relief valve connection 1 1 1 1 1 1 relief connection 1 1 1 2 2 2 standard setting bar 5 5 5 5 5 5 Electrical supply water heater 1N V 230 230 230 230 230 230...

Страница 4: ...18IP22B IV Fig 1 Dimensions Dimensions The water heater is available as either Top and side clearances are 600 mm MINIMUM...

Страница 5: ...18IP22B V Fig 2 Dimensions 500 litre tank R18 SUPA FLO PLUS with BT 500 litre tank...

Страница 6: ...18IP22B VI...

Страница 7: ...ransport 17 5 INSTALLATION 19 5 1 Boiler room 19 5 1 1 Siting 19 5 1 2 Boiler room ventilation 19 5 1 3 Air supply and ventilation 20 5 2 Unit connections 21 5 2 1 Gas supply 21 5 2 2 Electrical suppl...

Страница 8: ...OPERATION AND FAULT INDICATION 42 7 1 Function 42 7 2 Regulation 42 7 3 Control panel 42 7 4 Fault indications 43 7 5 Start up 44 7 6 Shut down 44 7 7 Warnings 44 7 8 Fault finding table 45 8 MAINTEN...

Страница 9: ...and water heater technology United Kingdom by Andrews Water Heaters Wednesbury One Black Country New Road Wednesbury West Midlands WS10 7NZ Telephone 0121 506 7400 Facsimile 0121 506 7401 For advice...

Страница 10: ...manufactur ers and suppliers of products for use at work to ensure so far as it is reasonable practicable that such products are safe and without risk to health when properly used and to make availab...

Страница 11: ...heater types are fitted with a 18 tube heat exchanger of the 2 pass type including stainless steel manifolds The use of extruded copper fin pipes in the heat exchanger leads to higher efficiency The...

Страница 12: ...r 7 Connection tray 27 Pressure test points 11 Servomotor air damper gas input 28 Temperature control unit 13 Modulating gas valve 29 Safety system control box 15 Modulating air damper 30 Control pane...

Страница 13: ...vo motor 3 Draught diverter 12 Front adjustment limit stop 4 Air in take 13 Linkage assembly 5 Heat exchanger 14 Adjustment screw 6 Connection tray 15 Lock screw for air damper 7 Combustion chamber 16...

Страница 14: ...removed without the use of any special tools by means of a click system Combustion chamber The chassis consists of two side frames with steel supports Dura blanket type thermal insulation is sandwiche...

Страница 15: ...the efficiency of the heat exchanger The stain less steel supply and return pipes together with the water mani folds form the heat exchanger and is pressure tested at 16 bar The R18 water heater is s...

Страница 16: ...jector nozzle mounted on the gas manifold Combustion air damper A combustion air damper is situated underneath the burners Gas train The principal components of the gas train are a main governor and t...

Страница 17: ...ws a Building Management system to influence the flow temperature using a 0 10 VDC control signal Boiler temperature controller RWF40 A Process value actual temperature B Set point temperature C Burne...

Страница 18: ...is possible with a EW control system Weather dependent setpoint shift The RWF40 can be configured in such a way that if a Ni1000 outside sensor e g QAC22 is connected a weather depen dent setpoint shi...

Страница 19: ...SPL SPH 1 Parameter level Parameter Display Value range Factory setting Limit value of limit comparator AL 1999 9999 digit 0 1 Switching differential for limit comparator HYSt 0 999 9 digit 1 1 Propo...

Страница 20: ...w switch The water flow switch is installed in the flow manifold and continuously monitors the minimum water flow If the water flow falls below a preset level the burner is shut down and will go to lo...

Страница 21: ...the burners The design and operating principle of the R18 water heater ensures that limescale precipitation is kept to an absolute minimum when operating under the following conditions Water hardness...

Страница 22: ...s than 90 C We emphasize that you should always give priority to the above mentioned standards and regulations and that the installation regulations should be considered as an addition to these stan d...

Страница 23: ...addition to the information in this documentation always follow the standard safety regulations to prevent accidents Cover panels should only be removed for maintenance and servicing tasks Replace all...

Страница 24: ...sure that you follow all safety instructions properly Operation In case of gas leakage switch off the water heater and close the gas service cock Open doors and windows and notify the proper authoriti...

Страница 25: ...s data number plate The water heater is mounted on a wooden pallet For transpor tation the water heater is covered in a heat shrink protective covering The panel work is also covered in a protective...

Страница 26: ...ith a pallet cart or forklift truck the forks should be placed at the back of the water heater Using a crane Never swing the load over bystanders Always use special lifting harnesses which should be p...

Страница 27: ...n front of the water heater to allow removal of the burner trolley It is important that the water heater is sited so that extraneous material cannot be stored next to it The product has to be installe...

Страница 28: ...Where natural ventilation is required permanent openings at low and high level communicating directly with the outside air shall be provided The openings shall be sited so that they cannot be easily b...

Страница 29: ...nical ventilation are as follows Inlet air combustion ventilation 1 1 m per second per 1000 3 kW total rated heat input Extract air ventilation 0 45 m per second per 1000 kW total 3 rated heat input F...

Страница 30: ...ndards The water heater is wired according to the circuit diagram which is supplied with the water heater The water heater must be protected by a 6 amp fuse The water heater must have an electrical su...

Страница 31: ...y a recognised installer fully according to the current national and local requirements norms and standards The cold water feed recirculation and hot water flow are found on the side of the water heat...

Страница 32: ...nd side by special order i e standard or alternative handing To prevent temperature lag time at the tappoint and to keep the water temperature uniform a suitable sized recirculation pump must be fitte...

Страница 33: ...ught diverter in the flue The flue socket at the top of the water heater is sized for the direct attachment of single wall metal flue pipe Optional adapters can be obtained for twin wall metal pipe an...

Страница 34: ...uct exit velocity less than 8 m sec See for further instructions Supple ment The cold water feed pipes should be installed and protected in accordance with local regulations Generally this means that...

Страница 35: ...36 C To achieve this a slow operating motorised valve controlled by a thermostat in the secondary return is required temperature of 43 C are temperature losses in the pipework a temperature of 60 C i...

Страница 36: ...hing 10 people 150 300 35 5 10 per outlet 6 people 120 180 35 6 12 per outlet shower 60 80 40 10 15 Taps fitting capacity diame ter in mm 10 half open 40 5 15 half open 40 10 20 half open 40 25 fully...

Страница 37: ...ther the water is acid or alkaline A solution is acid when pH is less than 7 A solution is alkaline when the pH is greater than 7 The pH is measured at 25 C A pH of 7 corresponds to a neutral water Th...

Страница 38: ...r hardness in Maximum pH Maximum operating ppm temperature in C 0 80 8 4 90 80 250 7 6 85 250 350 7 2 80 350 500 7 0 60 Table 11 Maximum operating level When the operating temperature exceeds the limi...

Страница 39: ...wash 0 5 4 restaurant 15 100 4 hairdresser 3 seat 1 beauty salon 4 assistant 1 offices 1 washroom 1 meals sitting Institutions sport club 5 shower 4 school 4 shower 3 factory 5 shower 2 4 hospital 2 o...

Страница 40: ...a constant draw or small fluctu 5 8 2 Dual temperature With storage tank 500 l system Applicable to projects where exact temperatures have to be ations without large peak load Such as hotels without c...

Страница 41: ...kept within small tolerances Industrial applications such as carwash removing of protective wax layer photo and film processing laboratories plating processing slaughterhouses etc This application fi...

Страница 42: ...e heat exchanger is free of any such deposits after flushing the system Water heating system fill the system up to the standard set pressure bleed the system switch on all pumps and check for correct...

Страница 43: ...een purged in accordance with IM 2 or BS 6891 as appropriate IV Check that all electrical supplies are isolated V Check electrical earth continuity between the water heater gas pipework and the mains...

Страница 44: ...he gas inlet service cock as follows Refer to Gas trains fig 34 1 Ensure that gas service cock and pilot manual cock are closed 2 Unseal and connect a pressure gauge to test point 10 1 and unseal test...

Страница 45: ...hut off valve is letting by and should be replaced 12 Seal test point 10 2 replace pressure gauge on unsealed test point 10 1 and open pilot manual cock 13 Open and close the gas service cock to press...

Страница 46: ...ameter 1 85 mm minimum load 20 Type Burner Pilot Air damper pressure pressure opening mbar mbar mm closed 132 0 8 3 5 8 154 0 8 3 5 8 180 0 8 3 5 8 210 0 8 3 5 8 244 0 8 3 5 8 280 0 8 3 5 8 full load...

Страница 47: ...g from the front electrical tray Open the gas service cock and pilot manual cock and with the control thermostat on a high setting turn on the electri cal supply and the on off switch on the front con...

Страница 48: ...off valves for gas leaks with a suitable leak detection fluid Switch off the water heater remove pressure gauge and reseal test point e Connect a A meter 0 50 A in series with the flame detection cir...

Страница 49: ...mentation to the person responsible for the plant and explain the method of safe operation Ensure that he she is fully conversant with the starting shut down general operation and emergency shut down...

Страница 50: ...valve opens and gas ignites over complete burner tray The modulating control will commence from low fire condition modulates between 20 and 100 heat demand If the heat demand is smaller than 20 the b...

Страница 51: ...2 and 5 on Reset by pushing button 3 If the flow temperature exceeds the high limit setting the boiler will mechanically lock out and red lamp 2 illuminates Reset by pushing button 3 and allow the uni...

Страница 52: ...eater on using the power switch 1 E In case of failure observe type of failure take necessary steps to rectify refer to section 7 8 for details F Set temperature regulator as required the power switch...

Страница 53: ...ing II servo motor is ting micro switch II set above 20 servo motor Heat demand Closed control switch Check and repair Servo motor does not main gas valve is inope react rative Turn open relay inopera...

Страница 54: ...shut Rectify off valve or Connections Pilot injector blocked Clean Pilot governor set too low Adjust Pilot burner ignites but Check flame probe If damaged replace water heater then goes to lock out in...

Страница 55: ...t least once every year and cleaned if necessary Frost protection When water heater is not in operation for a long period of time the heat exchanger should be protected against frost This can be achie...

Страница 56: ...e handings the sight glass will be located on the right side of the burner assembly for inspection of water heater ignition combustion pilot flame Burner tray The burner manifold and the gas regulator...

Страница 57: ...hermore the cause of the problem should be ascertained and rectified Heat exchanger internal cleaning Descale the heat exchanger with the correct chemicals Filter inspection use of a gas filter is rec...

Страница 58: ...m the front electrical panel release the screws at all 4 sides of the burner trolley The burner trolley can now be withdrawn from underneath the water heater Remove the stainless steel sidebaffles dow...

Страница 59: ...the condition of the ignition and sensing electrode at the right hand end of the burner assembly There should be no burning of the metal tip and the ceramic should not be cracked Replace the burners s...

Страница 60: ...s control linkages are in good working order and that there is no play in the gas control spindle Replace the burner trolley and bolt into position Re connect the electrical connectors to the connecti...

Страница 61: ...section Servicing Ensure that the burners are not damaged or warped Injectors Remove the burner trolley and burner bars as described before With the burner bars removed the injectors can be unscrewed...

Страница 62: ...panel components Release the fixing screws from the cover of the electrical con nection tray Refer to fig 25 for the locations of the various controls Replace components by removing electrical connect...

Страница 63: ...e 5 Using a suitable tool carefully saw through the damaged fin tube and remove from the fin tube mounting plates 4 The fin tube will be de finned approximately 80 mm on one side The end of the fin tu...

Страница 64: ...retaining bars with the nuts screwed in finger tight Refit the rest of the header retaining bars also with the nuts screwed in finger tight Tighten the retainer bars in four stages and in the sequence...

Страница 65: ...uts 8 7 Service For service and maintenance the service department of your supplier can be contacted Andrews Water Heaters Wednesbury One Black Country New Road Wednesbury West Midlands WS10 7NZ Telep...

Страница 66: ...ating gas valve Model 132 180 Rmx 2 8132G1GS Model 2034 2043 Rmx 2 8210G1GS Modulating valve servomotor Berger Lahr STM30Q15 63 RMS005 Pilot gas valve Johnson control SM474 RKS025 Ignition transformer...

Страница 67: ...may be helpful IM 2 Purging procedures of non domestic gas installations IM 5 Soundness testing procedures for industrial and com mercial gas installations IM 11 Flues for commercial and industrial g...

Страница 68: ...18IP22B 60...

Страница 69: ...18IP22B 61...

Страница 70: ...18IP22B 62...

Страница 71: ...18IP22B 63...

Отзывы: