17
A
Installation
This section will include instructions on installation of the SmartBox
®
controller system,
row units, and wiring cables. Suggested cable routings and lift switch mounting loca-
tions will be shown at the end of this section in Appendix A. The order in which you
install your system components may vary from the order shown in this manual. These
instructions are grouped by system. A general installation sequence is as follows:
1.
Remove existing insecticide boxes and chains (if necessary).
2.
Install planter brackets (if necessary).
3.
Install cradles.
4.
Install meters onto base containers.
5.
Install base containers in cradles.
6.
Install controller in tractor.
7.
Install battery cable.
8.
Loosely route all wiring and harnesses (do not use cable ties at this point).
9.
Install power distribution box and lift switch.
10.
Adjust wiring and use ties to secure.
Due to the vast number of planter configurations and continuous introductions of new
planter designs, your planter may differ slightly from the figures shown here. If you
have questions concerning installation of the SmartBox
®
System on your planter, please
contact your AMVAC representative or call 1-888-SMARTBOX.
Содержание SmartBox
Страница 1: ...Parts and Operator s Manual ...
Страница 5: ...4 A ...
Страница 32: ...31 A Suggested 16 Row Planter Arrangement Diagram ...
Страница 33: ...32 A Suggested 36 Row Planter Arrangement Diagram ...
Страница 34: ...33 A Suggested 16 Twin Row Planter Arrangement Diagram ...
Страница 35: ...34 A Wiring Diagram Parts ...
Страница 57: ...56 B Speed Input Setup continued ...
Страница 59: ...58 B Grouping continued ...
Страница 68: ...67 D ...
Страница 74: ...73 D Sensor Enable Disable ...
Страница 75: ...D 74 Weather Info ...
Страница 77: ...D 76 Area Information ...