background image

620LK Operation and Maintenance Manual – Rev. J – Updated January 2020 

Page 16

   

 

 

 

 

 

 

 

 

 

 

 

 

13231 Rooster Springs Rd. 

Austin, TX 78737 

T:

 (512) 858-4045 

E:

 [email protected] 

amptec.com 

Zero Adjustment: 

With a precision 0.001 Ω (1.0 mΩ

) resistance standard that’s 

0.005% or better, connect 4-Wire Kelvin test jacks (630-304) to the AMPTEC 620LK 

meter. Through the top far right rear panel hole, adjust the trim-pot (see above diagram 

labeled zero) to make the meter read the exact value of the 

.0 mΩ

 laboratory standard 

resistor (i.e

. ~1.00 mΩ

 value will be displayed). Because of the autolock feature, you will 

have to wait 5 to 10 seconds between adjustments and readings for settling and an 

updated display of the measurement. The meter will continue to sample and hold, and 

then resample as long as it senses any continuity. 

 

Full-scale Adjustment:

 Next,

 

connect the meter via the 630-304 test leads across a 

precision 100 m

Ω

 resistance standard which is a 0.005% or better accuracy resistance 

standard. Adjust the full-scale pot, using the hole located to the top left of the rear panel 

zero pot access hole (see above diagram labeled fullscale), until the display is the 

actual value of the 100 m

Ω

 resistance standard in milliohms (i.e. 99.97 m

Ω

 if the 

standard is actually 0.09997 

Ωs

). Because of the autolock feature, you will have to wait 

5 to 10 seconds between readings for settling and an updated display of the 

measurement. The meter will continue to sample and hold, and then resample as long 

as it senses any continuity. 

 

Finally, connect the meter via the 630-304 test leads across a precision 1.0 

Ω 

resistance standard which is a 0.005% or better accuracy resistance standard. Allow a 

few seconds for settling time. Keep in mind the meter autoranges up to the 2.0 Ω range 

when measuring a value above 200 mΩ. Verify the meter is within 5 counts (± .005 Ω) 

on a 1.0 Ω standard.

 

 

This concludes the adjustment procedure for the AMPTEC 620LK meter. 

 

E-7.1 Recommended Calibration Standards 

We recommend using our 630-304 4-Wire banana jack test lead set to calibrate the 

620LK meter. If you are interested in purchasing a set of these leads, please contact 

AMPTEC. 

 

If you need to purchase resistance standards, we recommend using a reputable 

manufacturer and insuring that all standards are N.I.S.T. traceable. AMPTEC currently 

use

Ohm-Labs

 for many of its standards. 

 

AMPTEC has a full-scale calibration laboratory within its manufacturing facility, and has 

the full capability to calibrate your product(s) for you. If you are interested in using our 

calibration services, please see section E-2 on page 13. 

 

E-8 PCB Removal 

Removing the PCB from any of our products is strongly discouraged. If a user is going 

to perform the task, they need be authorized and trained. AMPTEC provides a free PCB 

replacement for products under warranty, and a small fee for non-warranty products. 

Removing the PCB from the 620LK meter will void the product’s warranty and 

calibration. 

Содержание 620LK

Страница 1: ...13231 Rooster Springs Rd Austin TX 78737 T 512 858 4045 E info amptec com amptec com AMPTEC RESEARCH MODEL 620LK OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...ck Feature Information p 9 D 3 620LK Padded Carrying Case Photo and Information p 11 D 4 Detailed Use Description p 11 SECTION E MAINTENANCE REPAIR AND CALIBRATION E 1 General Maintenance Repair Calib...

Страница 3: ...s UAVs drones missiles etc Continuity determinations on fuses electrical cable connections heavy duty metal to metal connections Bonding measurements for metal to metal connections Featuring an all me...

Страница 4: ...replacement see section E 9 1 on page 17 4 Perform a visual test lead integrity check It is recommended that the user perform a basic visual inspection of their test lead set to confirm there is no d...

Страница 5: ...play is 20 000 counts 4 digit liquid crystal display with a back light that indicates autolock See section D 2 7 on page 9 for additional information about the autolock feature Low Battery Indication...

Страница 6: ...a jack test lead set 630 304G 4 4 Wire banana jack test lead set with ground 630 305 4 Twin single banana jack lead set 630 401 4 Single point handheld Kelvin probes 630 405K 10 heavy duty spiked Kelv...

Страница 7: ...d start updating the LCD screen once an electrical connection has been made After approximately 3 seconds the meter will produce a beeping sound and the backlight will turn on to illuminate the LCD sc...

Страница 8: ...wires then terminate in a variety of configurations depending upon the accessory The 620LK keyed access connector also makes it virtually impossible during normal operation to incorrectly connect lea...

Страница 9: ...quid crystal display and high quality the display itself should have a life lasting many years Should the display become damaged or stop operating properly it can be replaced at an AMPTEC facility The...

Страница 10: ...ther to produce the final autolocked measurement which is the reading displayed while the backlight is on To assist the user the meter produces an audible beeping indicator along with the lit backligh...

Страница 11: ...tem D AUTO MEASURE RESET BUTTON Press and hold to reset a measurement that has been locked Item E Power On Off Switch with LED Press and hold for 2 seconds to power the unit on The display backlight a...

Страница 12: ...s the test probes against a conductor meaning continuity is sensed When ready to make another measurement simply place the probes back on the test items and the meter will automatically make another m...

Страница 13: ...duct lines and is capable of fixing nearly any issue your instrument may have AMPTEC maintains one sole facility for both the manufacturing and repair of its products AMPTEC RESEARCH CORP 14101 Hwy 29...

Страница 14: ...00 mA DC level of test current On a 1 resistor the 620LK 100mA output should get a 100mV drop 0 10V 0 10A For DVM scaling on the 2 range voltage drop is amplified using a x10 for range scaling hence a...

Страница 15: ...2 Check for a reading of 0 000 3 Put the output leads across a 0 100 resistance standard 4 The display should read 100 00 m 10 counts depending on the resistor s accuracy If the above test proves unt...

Страница 16: ...ated display of the measurement The meter will continue to sample and hold and then resample as long as it senses any continuity Finally connect the meter via the 630 304 test leads across a precision...

Страница 17: ...he main PCB back in and replace the front panel and screws E 9 Battery Compartment Design and Description The metal battery compartment is powder coated to make it chemically resistant to battery leak...

Страница 18: ...This certification was gained in 2013 and is maintained with quarterly inspections by an independent party AMPTEC also follows UL 913 s quality standards plant wide including the adoption of a qualit...

Страница 19: ...____________________________________________________________ ____________________________________________________________ ____________________________________________________________ _________________...

Отзывы: