12. Insulate lug barrels with UL94 V-0-rated 

heat-shrink tubing.  

13. Clean the terminals and lugs with a  

nonabrasive, nonmetallic pad.  

14. If required, lightly coat an antioxidant on the  

lugs and input BATT and RETURN terminals.  

15. Connect the lugs to input terminals on the  

back of the panel, as shown in Figure 5.  

16. Tighten the lugs to 140 in-lb. (~15.5 N•m), max.  
17. Make sure all interrupter positions are either empty, 

off or contain dummy fuses (phony, inoperative  

all-plastic slugs.) 

18. Enable the fuse or breaker at the primary distribution 

unit or battery (440A max.) to turn on Feed A to  

Side A of the panel and then check the voltage and  

polarity at input connectors of panel.  

Also check that:  

 

POWER A 

LED on the front of the panel turns 

on (green). 

 

POWER B 

LED is off. 

19. Repeat the previous step with Feed B and verify 

POWER B 

LED.  

20. With 

POWER A 

and 

LEDs green (normal operation), 

test power-fail relay and contacts at 

POWER FAIL

 

alarm terminals on the rear of the panel:  

  Expect continuity (0

Ω

) between Terminals 

C

 

and 

NC

  Expect an open circuit (

Ω

) between Terminals 

C

 and 

NO

.  

21. Test fuse alarm relay contacts at 

ALARM

 (CB/Fuse 

Alarm) terminals on the rear of the panel.  

  Expect continuity (0

Ω

) between Terminals 

C

  

and 

NC

.  

  Expect an open circuit (

Ω

) between Terminals 

C

 and 

NO

 
 
 
 
 
 

Fig. 5: Input Lug Connections 

Fig. 6: Alarm Faceplate 

POWER 

POWER 

ALARM 

Содержание Telect 350CB06

Страница 1: ...Dual Feed 350A 6 Circuit Breaker TFD Distribution Panel with 5 GMTs Installation Guide...

Страница 2: ...rer that serves the data and communications markets We design manufacture and distribute products for customers who need an end to end solution for network connectivity fiber power distribution and ra...

Страница 3: ...ion 5 1 5 Installation 5 1 6 Parts Accessories 13 1 7 Schematic Drawing 15 1 8 Drawings 16 List of Figures Figure 1 350CB06 Distribution Panel 1 Figure 2 Bracket Orientation 5 Figure 3 Rack Mounting 6...

Страница 4: ...cuit breakers up to 100A rated continuous current 80 of rated This panel ships with solid covers over the circuit breaker TFD positions and with fuse slot fillers in the GMT holders Sides A and B are...

Страница 5: ...ow required for safe operation of the equipment is not compromised Mechanical Loading Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mech...

Страница 6: ...n or 15 mm wrench to 140 in lb 15 5 N m Input wire size 1 AWG to 750 MCM Breaker Fuse Outputs Specifications Max output single pole long delay circuit breaker ea 100A Max output TFD holder schematic C...

Страница 7: ...thority responsible for the location Only qualified technicians may install and maintain this product Grounding Specifications Earth GND terminal studs for dual hole compression lugs 1 4 20 studs on 5...

Страница 8: ...lly unpack it and compare it to the packaging list Please report any defective or missing parts to Amphenol Network Solutions Quality at quality amphenol ns com or call 1 509 926 6000 Amphenol Network...

Страница 9: ...t the panel as high as possible on the rack 3 Tighten the screws to 35 in lb 4 29 N m If you intend on installing more than one panel per rack you need to plan a rack arrangement that dissipates heat...

Страница 10: ...nnect using 1 4 20 hex nuts and flat washers provided as shown in Figure 4 9 Tighten the bolt to 25 in lb 2 83 N m max WARNING Before connecting input power cables make sure input power to panel is tu...

Страница 11: ...Enable the fuse or breaker at the primary distribution unit or battery 440A max to turn on Feed A to Side A of the panel and then check the voltage and polarity at input connectors of panel Also chec...

Страница 12: ...t wire at a time 24 Insulate lug barrels with UL 94V 0 rated heat shrink tubing 25 Clean panel terminals and lugs with a nonabrasive nonmetallic pad 26 If required lightly coat antioxidant on the lugs...

Страница 13: ...r end of the output wire to load ALERT GMT fuses have a small inherent electrical resistance resulting in a small inherent power loss For this reason GMT fuse manufacturer recommends that the load for...

Страница 14: ...itions between breakers Install the GMT fuses so that the failure indicator flags are at the top 36 Do one of the following Switch breakers to ON Install fuses Then test power and polarity at input of...

Страница 15: ...er s designation card shown below is a 10 in 254 mm by 2 1 4 in 57 mm card that folds in half to fit a card holder located to the right of the status LEDs 39 Re install the terminal cover 40 Lastly en...

Страница 16: ...0 amp long delay 090 0052 0020 30 amp long delay 090 0052 0030 40 amp long delay 090 0052 0040 50 amp long delay 090 0052 0050 60 amp long delay 090 0052 0060 70 amp long delay 090 0052 0070 80 amp lo...

Страница 17: ...8 40A 130482 50A 130484 60A 130486 70A 130488 Table 3 GMT Fuses Item Description Part Number of Fuse Part Number of Colored Designation Pin GMT Fuses 18A Yellow YEL 130781 102435 21 25A Violet VIO 100...

Страница 18: ...al Feed 350A 6 Circuit Breaker TFD Distribution Panel with 5 GMTs 1 7 Schematic Drawing BATT BATT BATT BATT RTN RTN RTN RTN A Input B Input C GND C GND Note Relays shown in alarm condition POWER ALARM...

Страница 19: ...olutions All rights reserved 12 16 19 138661 5 A0 509 926 6000 amphenol ns com Dual Feed 350A 6 Circuit Breaker TFD Distribution Panel with 5 GMTs 1 8 Drawings Front View 19 000 17 250 4 970 Top View...

Отзывы: