COMMISSIONING AND CALIBRATION
Prior to being put into service, the electrical protection system must be correctly commissioned. This
manual does not cover system commissioning; the full scope of commissioning tests should be
determined during the risk assessment or FMEA covering the design of the electrical protection system.
The following test can provide guidance on checking the correct operation of the ABCM Battery Charger
during commissioning. This is not intended to provide an exhaustive commissioning checklist, but should
be considered to be a minimum set of tests.
5.1.1 Commissioning
1. Open all circuit breakers
2. Turn on DC power supply and close battery circuit breaker.
3. The controller should now power up and the high resolution display will show the Status Mode
screen.
4. Close the AC input power circuit breaker.
5.
This will activate the rectifier system and start to charge the battery in ‘Float’ mode.
6. At this stage there should be a fault alarm shown on the display.
7. Turn on the load circuit breakers as required.
8. The alarm should no longer be showing on the display panel.
9. The charger will now start supplying the loads and charging the battery bank/s.
10. The Status screen will display the battery voltage and current, load current and battery
temperature, if enabled and valid.
11. The ABCM Battery Charger should begin to top up the batteries.