
60
System Integration
Rev 12 – NOV 2019
OMMG00012
Temperature Sensor Installation
•
Position as close as possible to the point of control.
•
Ensure positioned at least 6 pipe diameters in length from any junction.
•
Ensure the end 40 mm of probe is a close as possible to the centre of the
flow path.
•
Do not run cables in very hot areas which can cause cable failure and
inaccurate measurement.
•
Avoid installation in areas of high vibration.
•
Avoid installation into potential air pockets.
•
Position in an accessible location for future maintenance access.
•
Use heat transfer compound in thermal well.
Controller Installation
The installation will be affected by the choice of controller components. Refer
to manual OMM807100043 (PID Controllers) for specific installation details.
Содержание 10GEF
Страница 1: ...Doc No OMMG00012 Revision 12 NOV 2019 G Valve electric actuator Operation and Maintenance Manual...
Страница 2: ......
Страница 14: ...14 System Overview Rev 12 NOV 2019 OMMG00012...
Страница 26: ...26 Electric Actuator Rev 12 NOV 2019 OMMG00012 Fig 7 EA Actuator Internal Wiring Without Positioner...
Страница 28: ...28 Electric Actuator Rev 12 NOV 2019 OMMG00012 Fig 9 EA Actuator Internal Wiring With Positioner...
Страница 52: ...52 Electric Actuator Rev 12 NOV 2019 OMMG00012...
Страница 54: ...54 PID Controller Rev 12 NOV 2019 OMMG00012...
Страница 64: ...64 System Integration Rev 12 NOV 2019 OMMG00012 Fig 22 System Wiring Diagram 8072D Controller...
Страница 67: ...67 System Integration OMMG00012 Rev 12 NOV 2019...
Страница 68: ...68 System Integration Rev 12 NOV 2019 OMMG00012...
Страница 74: ...74 Technical Data Rev 12 NOV 2019 OMMG00012 9 1 1 Valve Bore Fig 25 Valve Selection Curve...