Valve Body
OMMG00012
Rev 12 – NOV 2019
11
Remove and discard the upper and lower shaft O rings (9 & 11).
12
Inspect the valve internals for wear, damage and cleanliness. Clean and
replace if necessary.
Note
It is recommended that the upper and lower composite bearings (6 & 10)
are replaced at this stage.
Reassemble Valve (refer to Fig 4, page 18)
1
Fit new upper and lower shaft O rings (9 & 11) to the rotor shaft.
2
Carefully insert the rotor assembly into the valve body with the rotor in
the low temperature position.
3
Fit a new cover O ring (8) to the cover and position the cover on the
valve, aligning the marks made during disassembly.
4
Fit the cover bolts (1) and washers and tighten to a torque of 244 Nm (4”
& 6” valves) or 476 Nm (8” valve).
5
Fit the retaining plate (5) and new O ring (3).
6
Install the actuator onto the valve body in accordance with Sect 4.8.1
(page 36).
3.4.3
Dismantle and Assemble 10 and 12 inch Valves
Dismantle Valve (refer to Fig 5, page 20)
If the valve is installed in the upright position, it is possible to dismantle the
valve whilst still installed in the pipework as follows:
WARNING
The valve may contain hot/pressurised fluid. Ensure the valve is
isolated, drained and allowed to cool to a safe working level before
dismantling.
1
Switch off and isolate power to the actuator.
2
Using the handwheel, turn the valve to the low temperature position.
3
Mark adjacent points on the actuator and coupling and also on the
coupling and cover (6) to aid reassembly.
WARNING
If an actuator is removed from a valve fitted in a live system, the valve
rotor may rotate uncontrollably in the body. An actuator must never
be removed from a valve installed in a live system.
4
Remove the actuator from the valve body in accordance with Sect 4.8.1
(page 36).
5
Remove the bolts (2) and retaining plate (5).
6
Remove and discard the O ring (3).
7
Mark adjacent points on the valve body and cover to aid reassembly.
8
Remove the bolts (1) and washers securing the valve cover.
Note
There are two jacking holes in the valve cover to aid removal.
Содержание 10GEF
Страница 1: ...Doc No OMMG00012 Revision 12 NOV 2019 G Valve electric actuator Operation and Maintenance Manual...
Страница 2: ......
Страница 14: ...14 System Overview Rev 12 NOV 2019 OMMG00012...
Страница 26: ...26 Electric Actuator Rev 12 NOV 2019 OMMG00012 Fig 7 EA Actuator Internal Wiring Without Positioner...
Страница 28: ...28 Electric Actuator Rev 12 NOV 2019 OMMG00012 Fig 9 EA Actuator Internal Wiring With Positioner...
Страница 52: ...52 Electric Actuator Rev 12 NOV 2019 OMMG00012...
Страница 54: ...54 PID Controller Rev 12 NOV 2019 OMMG00012...
Страница 64: ...64 System Integration Rev 12 NOV 2019 OMMG00012 Fig 22 System Wiring Diagram 8072D Controller...
Страница 67: ...67 System Integration OMMG00012 Rev 12 NOV 2019...
Страница 68: ...68 System Integration Rev 12 NOV 2019 OMMG00012...
Страница 74: ...74 Technical Data Rev 12 NOV 2019 OMMG00012 9 1 1 Valve Bore Fig 25 Valve Selection Curve...