FINAL TESTING

Purging and analysing of the complete medical gas piping system shall be carried out in accordance 

with NFPA 99, 4-5 Testing. 

SET-UP

Set one operating regulator to “In Use” and the other to “Reserve”.  With  the  high  pressure  inlet 

valves outside the cabinet both OPENED, S-L-O-W-L-Y open the cylinder valves on the cylinders 

closest to the manifold on the “In Use” side.  After one minute S-L-O-W-L-Y open all other cylinder 

valves on that side.  Then repeat the procedure for the “Reserve” side.  A pipeline outlet downstream 

of the manifold such as a purge valve or terminal valve should be opened and vented safely, to 

produce a dynamic flow condition. 
When both banks are open, check the inlet gauges to ensure that the correct pressure is indicated 

and that the left hand and right hand banks have full cylinder pressure.  The line pressure should be 

55 psig [379 kPa] for all manifolds except for Nitrogen, 170 psig [1172 kPa]. 

RE-SETTING LINE REGULATORS

Back to handle out by turning it counter clockwise and press the bleed valve until gas empties from 

the regulator.  Then turn the handle clockwise until the desired pressure is reached. 

NORMAL OPERATING PROCEDURE

Normal operating procedure for the Amico manifold entails connecting of the proper medical gas to 

all cylinder extension bar outlets via the appropriate copper cylinder connection hose assemblies. 
With the high pressure inlet valves open, S-L-O-W-L-Y open the cylinder valves on the cylinders 

nearest the inlet valves on both banks. After waiting at least one full minute, allow time for the 

dissipation of generated heat, S-L-O-W-L-Y open all the rest of the cylinder valves, one at a time. 
The bank that was pressurized first will become the primary bank  by turning the handle on the 

corresponding operating regulator so it reads “In Use”.  The other operating regulator should read 

“Reserve”.   The High pressure inlet valves should be left open under normal operating conditions. 

In an emergency, these valves can be closed quickly. 
Once the header bars have been pressurized, the Amico manifold is operating, since all regulators 

and control equipment have been set in SET-UP section. When the primary supply bank is exhausted 

and switch-over to the secondary bank occurs, the pressure switch notifies the person responsible, 

that the cylinders on the primary bank need replacing. 
Be sure to change the operating regulator settings BEFORE changing the cylinders. To replace the 

empty cylinders with full ones, keep the high pressure inlet valves open throughout this procedure. 

Close all empty cylinder valves and remove them. Attach full cylinders in their place, then S-L-O-W- 

L-Y open the cylinder valve nearest the inlet valve and wait for at least one full minute before S-L-O- 

W-L-Y opening the remaining cylinder valves, one at a time. 

The introduction of full cylinder pressure into the cabinet’s main bar resets the pressure switch. The 

Amico manifold is then ready for the next switch-over. 

WARNING:

Fire Hazard. DO NOT permit smoking, or any other source of

ignition in area where the manifold is located, or near the relief valve vent

outlet. Be certain that all connections are free of dirt, grease and oil. These

substances burn with great intensisty in air, enriched with oxygen, or nitrous

oxide and some gas mixtures.

Содержание ALERT- 2

Страница 1: ...ECONOMY MANIFOLD ALERT 2 Installation and Maintenance Manual v1 5...

Страница 2: ...G ALARM SYSTEMS 7 SAFETY FEATURES 7 INSTALLATION8 RECEIPT AND LOCATION 7 ASSEMBLY INSTRUCTIONS 7 TESTING FOR LEAKAGE 9 FINAL TESTING 10 NORMAL OPERATING PROCEDURE 10 MAINTENANCE 11 GENERAL 11 CYLINDER...

Страница 3: ...are broken missing worn distorted or contaminated must be replaced immediately Should such repair or replacement become neces sary please contact Amico Corporation or their distributors All manifolds...

Страница 4: ...he master alarm or remote buzzer informing the hospital personnel that the In Use cylinder bank pressure is low and the cylinders need replacement At this point someone has to silence the alarm or buz...

Страница 5: ...mpressed Medical Air and Carbon Dioxide service the In Use regulator will be set at 200 psi and the Reserve regulator will be set at 120 psi For Nitrogen the In Use regulator will be set at 250 psi an...

Страница 6: ...tem Without Reserve Supply as classified in NFPA 99 Clause 4 3 1 5 This is one category of the broader classification Central Supply System which encompasses many types of sources of supply to nonflam...

Страница 7: ...cabinet door The two pipes extending from the top of the manifold one for line pressure relief and one for the operating pressure relief are labelled Cylinder Connections The Amico manifold is design...

Страница 8: ...boltssuppliedaspartoftheassemblies Removetheplugandchainassemblyoneachoutletconnectiononthecylinderextensionbar Attach the cylinder pigtails to the header bar connections while ensuring the check val...

Страница 9: ...nder extensionbarusingthecopperorstainlesssteelcylinderconnectionhoseassemblies pigtails supplied 2 Make sure all other outlets are capped with the plug and chain assemblies supplied 3 Make sure that...

Страница 10: ...ng at least one full minute allow time for the dissipation of generated heat S L O W L Y open all the rest of the cylinder valves one at a time The bank that was pressurized first will become the prim...

Страница 11: ...nd Valves A Inspect semiannually and test for external leakage and tightness of shut off CYLINDER EXTENSION BARS The following components shall be inspected semiannually as indicated 1 Test check valv...

Страница 12: ...ssure Regulator Faults Gas leakage around oper ating pressure regulator bodycap Venting at intermediate relief valve Pipeline not at desired pressure Required gas flow not available Low pressure relie...

Страница 13: ...OPEN THE CYLINDER VALVE ON THE CYLINDER CLOSEST TO THE CONTROL CABINET WATCH THE BANK PRESSURE DISPLAY ON THE FRONT OF THE CABINET TO MAKE SURE THE PRESSURE RISES SLOWLY TO THE FULL CYLINDER PRESSURE...

Страница 14: ...rogen NIT Header bars are sold separately M2 HBSG 04U GAS HBSG Staggard header bar or HBST Straight header bar 04 represents the number of cylinders 2 2 U represents language and color code U NFPA USA...

Страница 15: ...ug Chain assembly Nit M X HB NUT NIT Plug Chain assembly Oxy M X MAN 36 Copper pigtail c w Check valve M X HB PTC AIR Air Copper pigtail c w Check valve M X HB PTC CO2 CO2 Copper pigtail c w Check val...

Страница 16: ...E c o n o m y M a n i f o l d P a g e 1 6 APPENDIX A Economy Manifold Layout...

Страница 17: ...A l e r t 2 S e r i e s P a g e 1 7 APPENDIX B Piping Schematic Diagram NFPA...

Страница 18: ...Not supplied by Amico Hole size to be determined by the customer Recommended distance 57 from floor to center of bottom hole 14 50 15 00 14 50 381 mm Recommended distance 57 1448 mm from floor to cent...

Страница 19: ...14MadisonRd Fairfield NJ07004USA Tel 1 877 GOAMICO 1 877 462 6426 85FultonWay RichmondHill ONL4B2N4Canada Fax 905 764 0862www amico com AUG 04 M2 MANUAL ECO...

Отзывы: