E c o n o m y M a n i f o l d
P a g e : 8
attaches to the front of the wall bracket.
Cylinder Bank Installation Instructions
CAUTION:
This section contains important information necessary for proper installation of the
cylinder banks. Read it carefully before installing cylinder banks.
Position the wall brackets, if required, to support the extension bars and bolt in place.
Connect the two high pressure inlet valve / header bar assemblies to the CGA connections on either
side of the cabinet.
Secure the cylinder extension bar to the support using the U-bolts supplied as part of the assemblies.
Remove the plug and chain assembly on each outlet connection on the cylinder extension bar. Attach
the cylinder pigtails to the header bar connections, while ensuring the check valves are operating in
the proper direction.
When the medical gas piping system has been tested in accordance with
Part 4-5 Testing of NFPA
99
, the manifold can then be connected to it.
The outlet pipes leading from the Amico economy manifold should be connected to their respective
pipeline system connections. The connection to the relief valves should be made with a union
(supplied by others) to facilitate change if required.
As the threaded joints are installed, an appropriate sealing compound that is suitable for the gas being
transmitted shall be used.